Bhe/Pw/Pur/Ntprt/ Struct Fab Blr#3/190
|
| Description |
Site Fabrication (Including Final Painting) Of Structural Members For 125 Mt In Boiler 3 With Raw Materials In Running Meters Supplied/To Be Supplied From Bhel At 3 X800 Mw Pvunl Patratu Site, Jharkhand
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2025_BHEL_51676_1 |
|
Reference Number |
BHE/PW/PUR/NTPRT/ STRUCT-FAB-BLR#3/190 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | 3X800MW PATRATU TPS SITE |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=55629 |
| Start Date | August 11, 2025 19:30 |
| End Date |
Expired
21/08/2025
Expired 312 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of works for fabrication of structural items of boiler -1 at 3x800 mw pvunl patratu site for 05 months.
Award of works for fabrication of structural items of boiler -1 at 3x800 mw pvunl patratu site for 05 months.
Read moreBhe/pw/pur/ntprt/ struct-fab-blr#3/205
Site fabrication (including final painting) of structural members for 500 mt in boiler#3 for non-traceable materials with raw materials in running meters supplied/to be supplied from bhel at 3x800 mw pvunl patratu site, jharkhand
Read moreSecurity and allied services contract for 3x800 mw pvunl patratu project site located in state of jharkhand
Security and allied services contract for 3x800 mw pvunl patratu project site located in state of jharkhand
Read moreConstruction of n pit for chemical cleaning of boiler 1 and 2 at 3x800 mw pvunl patratu site
Construction of n pit for chemical cleaning of boiler 1 and 2 at 3x800 mw pvunl patratu site, post ptps, ramgarh, jharkhand.
Read moreProcurement of piping ibr fittings as per tcc for construction manager bhel site office 3x800 mw pvunl patratu project ramgarh jharkahnd on f.o.r.destination basis
Procurement of piping ibr fittings as per tcc for construction manager, bhel site office, 3x800 mw pvunl patratu project, ramgarh, jharkhand f.o.r. destination basis
Read moreBalance works of boiler and balance erection work of bunker and allied works in unit 3 at 3x800 mw pvunl patratu project jharkhand
Balance work of boiler and its auxiliaries esp and its auxiliaries critical piping p91 hp lp piping and bunker and allied works in unit 3 at 3x800 mw pvunl patratu project jharkhand
Read moreDesign, supply of prefabricated permanent colour coated sandwitched insulated metal cladding as per tcc for construction manager, bhel site office, 3x800 mw pvunl patratu project, ramgarh, jharkhand on f.o.r. destination basis
Design, supply of prefabricated permanent colour coated sandwitched insulated metal cladding as per tcc for construction manager, bhel site office, 3x800 mw pvunl patratu project, ramgarh, jharkhand on f.o.r. destination basis
Read moreThe work of supervision and testing services along with lab instruments, reagents glass wares consumables etc. required during chemical cleaning activity of boiler
The work of supervision and testing services along with lab instruments, reagents glass wares consumables etc. required during chemical cleaning activity of boiler at 3x800 mw pvunl project, patratu, ramgarh, jharkhand.
 
Read moreHiring borescope instrument and header inspection services for borescope inspection of boiler recirculation pump suction header in boiler-1
Hiring borescope instrument and header inspection services for borescope inspection of boiler recirculation pump suction header in boiler-1 at 3 x 800 mw pvunl patratu site.
Read more4 nos acid cleaning pump ,discharge head ,180 meter, discharge flow, 200 m3/hr , with motor and control panel, er panel for a period of 01 month in boiler 1 at 3x800 mw pvunl patratu site.
4 nos acid cleaning pump ,discharge head ,180 meter, discharge flow, 200 m3/hr , with motor and control panel, er panel for a period of 01 month in boiler 1 at 3x800 mw pvunl patratu site.