Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Stacking And Leveling Of Coal At Coal Stock Yard By Mechanical Means And Cleaning And Removal Below Surface Bunker At Kurja Ug Mine.
|
| Description |
Stacking And Leveling Of Coal At Coal Stock Yard By Mechanical Means And Cleaning And Removal Below Surface Bunker At Kurja Ug Mine.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_SECL_327975_1 |
|
Reference Number |
AGM/HSD/SO(M)/e-Tend/24-25/150 dtd 06.02.2025 |
| Tender Fee | 0 |
| EMD | 58100 |
| Tender Value | - |
| Place | SECL Hasdeo Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339959 |
| Start Date | February 06, 2025 23:30 |
| End Date |
Expired
18/02/2025
Expired 604 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Read moreConstruction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Construction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Read moreWhite washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.
White washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreStacking and leveling of coal stock yard by mechanical means at haldibari ug mine
Stacking and leveling of coal stock yard by mechanical means at haldibari ug mine
Read moreStacking and leveling of coal at stock yard at baherabandh ug mine of hasdeo area
Stacking and leveling of coal at stock yard at baherabandh ug mine of hasdeo area
Read moreStacking and leveling of coal at stock y6ard at baherabandh ug mine of hasdeo area.
Stacking and leveling of coal at stock y6ard at baherabandh ug mine of hasdeo area.
Read moreRepairing of 4 nos. bunker at kurja mine under kurja sub area.
Repairing of 4 nos. bunker at kurja mine under kurja sub area.
Read moreRepairing of 4 nos. bunker at kurja mine under kurja sub area.
Repairing of 4 nos. bunker at kurja mine under kurja sub area.
Read moreof your Industry type