Tender Details

Particulars Details
Title
Stacking And Leveling Of Coal At Coal Stock Yard By Mechanical Means And Cleaning And Removal Below Surface Bunker At Kurja Ug Mine.
Description
Stacking And Leveling Of Coal At Coal Stock Yard By Mechanical Means And Cleaning And Removal Below Surface Bunker At Kurja Ug Mine.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_327975_1
Reference
Number
AGM/HSD/SO(M)/e-Tend/24-25/150 dtd 06.02.2025
Tender Fee 0
EMD 58100
Tender Value -
Place SECL Hasdeo Area
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339959

Start Date February 06, 2025 23:30
End Date
Expired 18/02/2025

Expired 604 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.

Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.

Read more
Construction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.

Construction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.

Read more
White washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.

White washing and stone dusting along belt roadway, travelling roadways and return roadway from incline mouth to proposed depillaring panels 16ls,10ls, -16r and -9r in seam c of kurja ug mine, hasdeo area.

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Stacking and leveling of coal stock yard by mechanical means at haldibari ug mine

Stacking and leveling of coal stock yard by mechanical means at haldibari ug mine

Read more
Stacking and leveling of coal at stock yard at baherabandh ug mine of hasdeo area

Stacking and leveling of coal at stock yard at baherabandh ug mine of hasdeo area

Read more
Stacking and leveling of coal at stock y6ard at baherabandh ug mine of hasdeo area.

Stacking and leveling of coal at stock y6ard at baherabandh ug mine of hasdeo area.

Read more
Repairing of 4 nos. bunker at kurja mine under kurja sub area.

Repairing of 4 nos. bunker at kurja mine under kurja sub area.

Read more
Repairing of 4 nos. bunker at kurja mine under kurja sub area.

Repairing of 4 nos. bunker at kurja mine under kurja sub area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise