Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling And Removal Of Damaged And Unused Portion Of Chp Structure At Chora 10 Pit Colliery Under Kenda Area
|
| Description |
Dismantling And Removal Of Damaged And Unused Portion Of Chp Structure At Chora 10 Pit Colliery Under Kenda Area
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_329332_1 |
|
Reference Number |
GM/KND/AE(ENM)/55(TN)/24-25/42 |
| Tender Fee | 0 |
| EMD | 2700 |
| Tender Value | - |
| Place | Chora 10 pit Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341353 |
| Start Date | February 18, 2025 22:30 |
| End Date |
Expired
28/02/2025
Expired 595 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling and repairing of damaged/worn out ss liner from charging chute and removal of jammed coal from silo-2 of rajmahal chp.
Dismantling and repairing of damaged/worn out ss liner from charging chute and removal of jammed coal from silo-2 of rajmahal chp.
Read moreDismantling, shifting and removal of damaged unserviceable portions for nagarjuna konda museum
Dismantling, shifting and removal of damaged unserviceable portions for nagarjuna konda museum
Read moreDismantling of old damaged platform with its bracing and two way chute and fabrication of the same at surface bunker of ncph colliery r-6 mine, ncph sub-area
Dismantling of old damaged platform with its bracing and two way chute and fabrication of the same at surface bunker of ncph colliery r-6 mine, ncph sub-area
Read moreRepair, strengthening, fabracation and replacement of damaged,repair, strengthening, fabracation and replacement,fabrication and installation of cable tray support system,foundation repair and cement plastering works for all antenna,dismantling and refixing of existing maintenance platform of 13 mtr towers,dismantling and refixing of existing maintenance platform of 25 mtr towers,repaired structure shall be provided with 02 coats of red oxide zinc chromate primer
Repair, strengthening, fabracation and replacement of damaged,repair, strengthening, fabracation and replacement,fabrication and installation of cable tray support system,foundation repair and cement plastering works for all antenna,dismantling and refixing of existing maintenance platform of 13 mtr towers,dismantling and refixing of existing maintenance platform of 25 mtr towers,repaired structure shall be provided with 02 coats of red oxide zinc chromate primer
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read morePainting and illumination of head gear structure located at chora 10 pit colliery under kenda area
Painting and illumination of head gear structure located at chora 10 pit colliery under kenda area
Read moreInstallation of lighting towers at different locations of chora block incline colliery, kenda area
Installation of lighting towers at different locations of chora block incline colliery, kenda area
Read moreSide wall in rviia seam in chora block incline colliery under kenda area ecl
Side wall in rviia seam in chora block incline colliery under kenda area ecl
Read moreof your Industry type