Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cs010060019 Input Spiral Bevel Pinion With Matching Spiral Bevel Wheel And Lock Nut For Elecon 12
|
| Description |
|
| Organisation | Materials Management | Ministry of Coal |
| Tender Id | GEM/2025/B/6527525 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | 2 Crore |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 02, 2025 19:43 |
| End Date |
Expired
01/09/2025
Expired 322 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hand brake screw nut with washer to irs rdso drg. no. wa/bg-6346, alt-nil.
For complete deion and other details, please refer to tender
Read moreOptical power meter with visual fault locator
For complete deion and other details, please refer to tender
Read moreJp/b862-000-yf-mr-2010/553 - special flow instruments for pdh pp plant with ethane and propane handling facilities project at dahej, gujarat
Jp/b862-000-yf-mr-2010/553 - special flow instruments for pdh pp plant with ethane and propane handling facilities project at dahej, gujarat
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreof your Industry type