Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm I Unit Iii Collecting Of Coal Rejects From The Mill Chute, Dumping In The Specified Area, Clearing The Same, Loading, Transporting And Dumping In A Specified Area Of Ttps For A Period From 01.04.2025 To 31.03.2026
|
Description |
Ttps Operation Circle Mpm I Unit Iii Collecting Of Coal Rejects From The Mill Chute, Dumping In The Specified Area, Clearing The Same, Loading, Transporting And Dumping In A Specified Area Of Ttps For A Period From 01.04.2025 To 31.03.2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_526068_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.26/25-26 |
Tender Fee | 0 |
EMD | 29300 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=626395 |
Start Date | February 19, 2025 16:45 |
End Date |
04/03/2025 ( Expired 97 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps operation circle mpm ii unit v replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Ttps operation circle mpm ii unit v replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Read moreTtps operation circle mpm ii unit v overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc., in mills 5a to 5f during forthcoming overhaul
Ttps operation circle mpm ii unit v overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc., in mills 5a to 5f during forthcoming overhaul
Read moreTtps operation circle mpm ii unit v renewal of badly eroded area of one portion of each mill separator in mill 5a, 5b and 5c
Ttps operation circle mpm ii unit v renewal of badly eroded area of one portion of each mill separator in mill 5a, 5b and 5c
Read moreTtps operation circle mpm ii unit iv renewal of badly eroded area of one portion of each mill separator in mill 4a, 4b and 4e
Ttps operation circle mpm ii unit iv renewal of badly eroded area of one portion of each mill separator in mill 4a, 4b and 4e
Read moreTtps operation circle mpm ii unit iv overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc., in mills 4a to 4f during forthcoming overhaul
Ttps operation circle mpm ii unit iv overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc., in mills 4a to 4f during forthcoming overhaul
Read moreTtps operation circle mpm ii unit iv replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Ttps operation circle mpm ii unit iv replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Read moreTtps operation circle mpm ii acp servicing of air conditioning system air ducts in unit control room, ventilation air duct of unit iii fan house to 6.6 kv switch gear room etc
Ttps operation circle mpm ii acp servicing of air conditioning system air ducts in unit control room, ventilation air duct of unit iii fan house to 6.6 kv switch gear room etc
Read moreTtps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2025 to 2026 in acwph
Ttps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2025 to 2026 in acwph
Read moreTtps operation circle mpm ii unit v attending repair works in journal doorassembly and mill of mills
Ttps operation circle mpm ii unit v attending repair works in journal doorassembly and mill of mills
Read moreTtps operation circle mpm ii acp replacement of defective cooling coil of ahu b and brassomatic valve of compressor in unit iii ac plant
Ttps operation circle mpm ii acp replacement of defective cooling coil of ahu b and brassomatic valve of compressor in unit iii ac plant
Read moreof your Industry type