Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
5 Micron Filter 20 Inch X 4 Point 5 Inch For Ro Plant,Diasafe Dialysate Pyrogen And Endotoxin Filte
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 26, 2025 19:01 |
End Date |
17/07/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read more5 micron filter 20 inch x 4 point 5 inch for ro plant,diasafe dialysate pyrogen and endotoxin filte
Read more
Upgradation of bathinda dabwali road nh 64 to refinery phullokhari rd 16 point 80 to 17 point 88 km with maintenance of road for 5 years in which 1 year defect liabillity period and 4 years maintenance period
Upgradation of bathinda dabwali road nh 64 to refinery phullokhari rd 16 point 80 to 17 point 88 km with maintenance of road for 5 years in which 1 year defect liabillity period and 4 years maintenance period
Read moreRoofing of one existing room size 4 20 x 5 40mts and finishing works including flooring, raising of wall plaster door s water proofing of roof and complete finishing department of home science
Roofing of one existing room size 4 20 x 5 40mts and finishing works including flooring, raising of wall plaster door s water proofing of roof and complete finishing department of home science
Read moreSurvey design fabrication supply installation testing and commissioning of total 20 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 5 years
Survey design fabrication supply installation testing and commissioning of total 20 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 5 years
Read moreConstruction of 01 one tts kitchen size 40 x 20 half wall galvalume sheet walling and roofing with 4 front verandah for field staff at ktds pta narsingarh agartala tripura west
Construction of 01 one tts kitchen size 40 x 20 half wall galvalume sheet walling and roofing with 4 front verandah for field staff at ktds pta narsingarh agartala tripura west
Read moreConstruction of 01 one tts kitchen size 40 x 20 half wall galvalume sheet walling and roofing with 4 front verandah for trainees of new recruit constable at ktds pta narsingarh agartala tripura west
Construction of 01 one tts kitchen size 40 x 20 half wall galvalume sheet walling and roofing with 4 front verandah for trainees of new recruit constable at ktds pta narsingarh agartala tripura west
Read moreHaemodialysis single lumen catheter 14ga x 5 1by 4 guide wire j tip straight 0 point 038 inch x 70c
Read more
Supply of man power for 24 x 7 (pump operation and valve operation at filter plant, intake well, sumpwell and different villages) under group water supply scheme for badikhairi block mandla and saliwara block mohgaon district mandla
Supply of man power for 24 x 7 (pump operation and valve operation at filter plant, intake well, sumpwell and different villages) under group water supply scheme for badikhairi block mandla and saliwara block mohgaon district mandla
Read moreMtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Read moreof your Industry type