Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Complete Eha Block For Main Turbine Hp Valve
|
| Description |
Procurement Of Complete Eha Block For Main Turbine Hp Valveinstalled In Stage 2 Of Ntpc Barauni Tpp
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2024_NTPC_84628_1 |
|
Reference Number |
NTPC/USSC-CPG3/9900275854 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Barauni Thermal Power Plant |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=87817 |
| Start Date | March 02, 2024 17:30 |
| End Date |
Expired
08/03/2024
Expired 951 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Submersible turbine pumps 1.5 hp,submersible turbine pumps 0.75 hp
Submersible turbine pumps 1.5 hp,submersible turbine pumps 0.75 hp
Read moreProcurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Procurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Read moreProcurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Read more18pc01a complete control valve,18pc02a complete control valve,spares for control valve
18pc01a complete control valve,18pc02a complete control valve,spares for control valve
Read moreProcurement of hydraulic cylinder for hp control valve servomotor of drive turbine of tdbfp installed at 1x500 mw unit sgtps, mppgcl, birsinghpur.
Procurement of hydraulic cylinder for hp control valve servomotor of drive turbine of tdbfp installed at 1x500 mw unit sgtps, mppgcl, birsinghpur.
Read moreProcurement of tse thermocouple for hp turbine exhaust temperature with accessories
Procurement of tse thermocouple for hp turbine exhaust temperature with accessories
Read moreof your Industry type