Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Repairing Of Rotating Unit With 2000 Gpm, 150mtr.Head, Mn P Make Double Stage Pump Of Abocp Mine Under Block Ii Area
|
| Description |
Complete Repairing Of Rotating Unit With 2000 Gpm, 150mtr.Head, Mn P Make Double Stage Pump Of Abocp Mine Under Block Ii Area
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_314629_1 |
|
Reference Number |
GM/B-II/AM (ENM)/E-TENDER/2024-25/152 dt 05.08.24 |
| Tender Fee | 0 |
| EMD | 4200 |
| Tender Value | - |
| Place | ABOCP Mine, Block-II Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=326054 |
| Start Date | August 09, 2024 14:30 |
| End Date |
Expired
19/08/2024
Expired 786 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rotating assembly complete for mnp est 200 by 250 centrifugal pump 160 lps head 120m
Rotating assembly complete for mnp est 200 by 250 centrifugal pump 160 lps head 120m
Read moreProcurement of raph complete seals set for tanda stage ii
Procurement of raph complete seals set for tanda stage ii
Read moreTggenco btps stage ii em division complete overhaul of 6.6 kv ht motors of stage-ii btps for the year 2026-27
Tggenco btps stage ii em division complete overhaul of 6.6 kv ht motors of stage-ii btps for the year 2026-27
Read moreConstruction of 02 nos. complete isolation stoppings (fly ash bricks) and 04 nos. preparatory complete isolation stoppings, including all materials, in 32l dep. panel, lws at tawa-ii mine, pathakhera area, wcl
Construction of 02 nos. complete isolation stoppings (fly ash bricks) and 04 nos. preparatory complete isolation stoppings, including all materials, in 32l dep. panel, lws at tawa-ii mine, pathakhera area, wcl
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreComplete repairing /rewinding and overhauling of pullen make 120 hp 550 volt 2900 rpm submersible motor and 6 stage pump of dobari colliery.
Complete repairing /rewinding and overhauling of pullen make 120 hp 550 volt 2900 rpm submersible motor and 6 stage pump of dobari colliery.
Read moreImprovement of road from high-tension double road to site number 10712 through mahadeshwara provision store at vijayanagara 4th stage, 2nd phase in hootagalli cmc limit
Improvement of road from high-tension double road to site number 10712 through mahadeshwara provision store at vijayanagara 4th stage, 2nd phase in hootagalli cmc limit
Read moreConstruction of 12 nos. complete ventilation stop-pings (fly ash bricks), in-cluding all material, in 32ln proposed depillaring panel, lws at tawa-ii mine, pathakhera area, wcl
Construction of 12 nos. complete ventilation stop-pings (fly ash bricks), in-cluding all material, in 32ln proposed depillaring panel, lws at tawa-ii mine, pathakhera area, wcl
Read more316l ss hp double ended cylinder, capacity 500cc, hydrotest pressure 3050psig(210bar),316l ss hp double ended cylinder, capacity 500cc, hydrotest pressure 5000psig(344bar),316l ss hp double ended cylinder, capacity 1000cc, hydrotest pressure 3050psig(210bar),ss 316 qtm4 series quick connect stem, 1/4 male npt,ss 316 qtm2 series quick connect , 1/4 male npt,ss 316 qf series quick connect body,ss 316 qf series quick connect stem,ss 316 nd series integral bonnet non-rotating stem needle valve 1/4 mnpt x 1/4 fnpt,ss 316 tm series rupture disk tee,ss 316 ndh series integral bonnet non-rotating stem needle valve 1/4 male & female npt,ss 316 ndh series integral bonnet non-rotating stem needle valve 1/4 female npt,ss 316 nd series integral bonnet non-rotating stem needle valve containing kalrez orings,ss outage tube adapter, 20 tube volume,ss outage tube adapter, 40 tube volume,ss 316 pipe fitting, hex nipple, 1/4 male npt,ss 316 pipe fitting, hex coupling, 1/4 female npt,ss 316 pipe fitting, adapter
316l ss hp double ended cylinder, capacity 500cc, hydrotest pressure 3050psig(210bar),316l ss hp double ended cylinder, capacity 500cc, hydrotest pressure 5000psig(344bar),316l ss hp double ended cylinder, capacity 1000cc, hydrotest pressure 3050psig(210bar),ss 316 qtm4 series quick connect stem, 1/4 male npt,ss 316 qtm2 series quick connect , 1/4 male npt,ss 316 qf series quick connect body,ss 316 qf series quick connect stem,ss 316 nd series integral bonnet non-rotating stem needle valve 1/4 mnpt x 1/4 fnpt,ss 316 tm series rupture disk tee,ss 316 ndh series integral bonnet non-rotating stem needle valve 1/4 male & female npt,ss 316 ndh series integral bonnet non-rotating stem needle valve 1/4 female npt,ss 316 nd series integral bonnet non-rotating stem needle valve containing kalrez orings,ss outage tube adapter, 20 tube volume,ss outage tube adapter, 40 tube volume,ss 316 pipe fitting, hex nipple, 1/4 male npt,ss 316 pipe fitting, hex coupling, 1/4 female npt,ss 316 pipe fitting, adapter
Read moreComplete repairing/rewinding of 3 phase marathon make induction motor, 6.6 kv, 750 kw, 1492 rpm, sl. no. 3f660895/2 failed during operation in the deep mine pumping zone of rajmahal ocp.
Complete repairing/rewinding of 3 phase marathon make induction motor, 6.6 kv, 750 kw, 1492 rpm, sl. no. 3f660895/2 failed during operation in the deep mine pumping zone of rajmahal ocp.
Read moreof your Industry type