Tender Details
Particulars | Details |
---|---|
Title |
Providing And Laying Di Of 500mm K 9 Pipe From Dhansa Metro Station To Nangloi Stand At Najafgarh Phirni Road Under Sub Division Ii, Najafgarh,New Delhi
|
Description |
Providing And Laying Di Of 500mm K 9 Pipe From Dhansa Metro Station To Nangloi Stand At Najafgarh Phirni Road Under Sub Division Ii, Najafgarh,New Delhi
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2025_PWD_272057_1 |
Reference Number |
05/EE/SWR-II/PWD/2025-26 |
Tender Fee | 0 |
EMD | 1.84 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=357232 |
Start Date | May 09, 2025 23:50 |
End Date |
17/05/2025 ( Expired 16 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and laying of 600 mm id di k-7 rising main from mps to lissara drain and replacement of machinery of mps at raman mandi district bathinda
Providing and laying of 600 mm id di k-7 rising main from mps to lissara drain and replacement of machinery of mps at raman mandi district bathinda
Read moreProtection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreSupply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 200 to 207 under electricity transmission division-ii, basti h.q. at siddharth nagar
Supply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 200 to 207 under electricity transmission division-ii, basti h.q. at siddharth nagar
Read moreAAAAAAAAAA
Login to viewImprovement of road by laying interlocking concrete block at munshi bazar road from prem. no 2/1/a to 2/1b and in front of 5/a munshi bazar road in ward no-57 under br-vii
Read moreIt addl. pune infotech park i industrial
Construction of 6 lane road using cement&#x0d concrete treatment with footpath and storm water pipeline&#x0d repairing and providing new curbing at center verge and&#x0d road furnitures from shivaji chowk to smashan bhumi&#x0d
Read moreRunning maintenance of rws scheme at amarpur under gomati district tripura/ sh- construction of boundary wall, fitting fixing of tiles, water proofing of sedimentation tank, reservoir, providing and laying of di pipe for sludge disposal etc. at purba
Running maintenance of rws scheme at amarpur under gomati district tripura/ sh- construction of boundary wall, fitting fixing of tiles, water proofing of sedimentation tank, reservoir, providing and laying of di pipe for sludge disposal etc. at purba
Read moreof your Industry type