Tender Details

About Tender

🏗️ Biennial Contract Opportunity For Scaffolding Supervision At Ntpc Lara 🏗️ Ntpc Limited, A Leading Public Sector Undertaking, Is Seeking Bids For A Biennial Contract To Supervise The Erection And Dismantling Of Instant Upright Make Quick Erect Scaffolding At Ntpc Lara, Located In Chhapora, Pussore, Raigarh, Chhatisgarh. 📅 Bid Submission Deadline: April 22, 2024, 12:00 Pm This Contract Is For A Period Of Two Years And Is Open To Qualified Professionals With Expertise In Scaffolding Supervision. Interested Parties Should Submit Detailed Proposals, Including Their Experience, Qualifications, And Methodology For Supervision, By The Specified Deadline. Keywords: Scaffolding Supervision, Ntpc Limited, Public Sector Undertaking, Biennial Contract, Erection, Dismantling, Quick Erect Scaffolding, Ntpc Lara, Chhapora, Pussore, Raigarh, Chhatisgarh
Particulars Details
Title
Biennial Contract For Supervision Of Erection And Dismantling Of Instant Upright Make Quick Erect Scaffolding At Ntpc Lara.
Description
Biennial Contract For Supervision Of Erection And Dismantling Of Instant Upright Make Quick Erect Scaffolding At Ntpc Lara.&#X0d
Organisation NTPC Limited | Public Sector Undertakings
Tender Id 2024_NTPC_85942_2
Reference
Number
NTPC/USSC-CPG3/9900278801
Tender Fee 0
EMD 0
Tender Value -
Place NTPC Lara, CHHAPORA, PUSSORE, RAIGARH, Chhatisgarh
Link
View Original Tender Notice

https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=89143

Start Date April 13, 2024 21:30
End Date
Expired 22/04/2024

Expired 906 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Custom bid for services - lumpsum price including gst as per scope defined in tender for erection and dismantling of scaffolding up to 24 meter height including supply of scaffoling materials,custom bid for services - lumpsum price including gst as per scope defined in tender for erection and dismantling of scaffolding above 24 meter height including supply of scaffoling materials,custom bid for services - lumpsum price including gst as per scope defined in tender for erection and dismantling of scaffolding inside confined space up to any height including supply of scaffoling materials,custom bid for services - lumpsum price including gst as per scope defined in tender for erection and dismantling of scaffold inside lldpe2 reactor, material is provided by gail

Custom bid for services - lumpsum price including gst as per scope defined in tender for erection and dismantling of scaffolding up to 24 meter height including supply of scaffoling materials,custom bid for services - lumpsum price including gst as per scope defined in tender for erection and dismantling of scaffolding above 24 meter height including supply of scaffoling materials,custom bid for services - lumpsum price including gst as per scope defined in tender for erection and dismantling of scaffolding inside confined space up to any height including supply of scaffoling materials,custom bid for services - lumpsum price including gst as per scope defined in tender for erection and dismantling of scaffold inside lldpe2 reactor, material is provided by gail

Read more
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - - erection and dismantling of tubular scaffolding for revamping of cooling tower cells and other jobs in urea plant of rcf trombay unit as per sow mentioned in the nit

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - - erection and dismantling of tubular scaffolding for revamping of cooling tower cells and other jobs in urea plant of rcf trombay unit as per sow mentioned in the nit

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Read more
Biennial contract for supervision of erection and dismantling of instant upright make quick erect scaffolding at two 800 mw units ntpc ltd / darlipali stpp, odisha

Biennial contract for supervision of erection and dismantling of instant upright make quick erect scaffolding at two 800 mw units ntpc ltd / darlipali stpp, odisha

Read more
Supervisory services during erection and dismantling of instant upright supplied aluminum quick erect boiler scaffolding system and daily inspection

Supervisory services during erection and dismantling of instant upright supplied aluminum quick erect boiler scaffolding system and daily inspection

Read more
Supervision of erection and dismantling of instant upright supplied quick erect scaffolding(qes) system for three units of 800 mw boiler overhaul at ntpc kudgi stpp.

Supervision of erection and dismantling of instant upright supplied quick erect scaffolding(qes) system for three units of 800 mw boiler overhaul at ntpc kudgi stpp.

Read more
Procurement of spares for alumunium quick erect scaffolding make instant upright for stage-2 boiler furnace scaffolding for ntpc mouda

Procurement of spares for alumunium quick erect scaffolding make instant upright for stage-2 boiler furnace scaffolding for ntpc mouda

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise