Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Outsourcing Of Trd Maintenance And Breakdown Activities In Gdi Depot,
Lwr Depot, Clr Depot, &Amp Cnr Depot Sections
Of Hubballi Division For The Period Of 2 Years
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77140255 |
Reference Number |
HE-TRD-2024-25-OT-26 |
Tender Fee | 0 |
EMD | 7.17 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77140255/viewNitPdf_4698100.pdf |
Start Date | September 03, 2024 16:06 |
End Date |
01/10/2024 ( Expired 276 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, manning, operation and maintenance of one tug of 40 ton bollard pull (asd/srp/voith) or more of rsv type-4/india coastal vessel for haldia dock complex for a period of seven years.
Supply, manning, operation and maintenance of one tug of 40 ton bollard pull (asd/srp/voith) or more of rsv type-4/india coastal vessel for haldia dock complex for a period of seven years.
Read moreHiring services of one no. new vehicle diesel driven, bs vi or latest compliance, brand mahindra bolero model b 4 base model or equivalent 2 wheeled drive under ps6, bongaigaon for row patrolling and other operational duties for a period of four years
Hiring services of one no. new vehicle diesel driven, bs vi or latest compliance, brand mahindra bolero model b 4 base model or equivalent 2 wheeled drive under ps6, bongaigaon for row patrolling and other operational duties for a period of four years
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreDes, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Read moreE.l.d.c.no/smii/p1/1231/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5
Selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5&#x0d
Read moreE.l.d.c.no/smii/p5/1232/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 2 zones 7 8 and10
&#x0d &#x0d selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 2 zones 7 8 and10&#x0d
Read moreUpgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Read moreOperation and maintenance for 41 schemes comprising mph with cwr connecting all sources, distribution system, rising mains and esr at various rwss of tehsil khetri district jhunjhunu for 05 years on private contract basis.
Operation and maintenance for 41 schemes comprising&#x0d mph with cwr connecting all sources, distribution&#x0d system, rising mains and esr at various rwss of tehsil&#x0d khetri district jhunjhunu for 05 years on private contract&#x0d basis.
Read moreSpecial repair of various link roads under repair programme 2022-23, 2023-24 and 2024-25 falling in market committee hoshiarpur assembly constituency urmar one year defect liability period plus 4 years maintenance of road group no. 1.
Special repair of various link roads under repair programme 2022-23, 2023-24 and 2024-25 falling in market committee hoshiarpur assembly constituency urmar one year defect liability period plus 4 years maintenance of road group no. 1.
Read moreof your Industry type