Tender Details

Particulars Details
Title
Nit No 06 Of 2025 26 Sl. No. 2 Pwd Road To Mukti Pool Bishnu Mandir
Description
Construction Of Road From Pwd Road To Mukti Pool Bishnu Mandir, Sakyong G.P., Pedong Block, Kalimpong. Length 2.50 Km.
Organisation PANCHAYAT AND RURAL DEVELOPMENT | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 3.71 Lakh
Tender Value
Place PEDONG
Link

AAAAAAAAAA

Login to view
Start Date June 27, 2025 23:30
End Date

18/07/2025 ( 20 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ce chz chm t 06 2025 26 provision of roof top solar plants totalling 500 kw at certainbuildings at chandimandir

Ce chz chm t 06 2025 26 provision of roof top solar plants totalling 500 kw at certain buildings at chandimandir

Read more
26 of 2025-26 of se/wbswc

Request for proposal for selection of system integrator to implement a comprehensive warehouse monitoring solution based on computer vision and ai for monitoring, analyzing, and optimizing warehouse operations, including inventory and security

Read more
Asphlting of road from behind putlighar infront pir sahab gali to dr. yusuf khalil house in ward no.09, zone no.05

Asphlting of road from behind putlighar infront pir sahab gali to dr. yusuf khalil house in ward no.09, zone no.05

Read more
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Read more
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Construction of cc road from hokarjon to raja house and rajaram to rakesh gour house at ward 2

Construction of cc road from hokarjon to raja house and rajaram to rakesh gour house at ward 2

Read more
Wbsdb/ee/ ced-iv/nit-11(e)/2025-26/ sl-14

Construction of concrete road from achintya mondals house

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise