Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Paver Block, Concertina Wire And Statue Of Jatra Tana Bhagat In The Campus Of Tana Bhagat Assembly Hall, Gumla Block, District Gumla.
|
Description |
Construction Of Paver Block, Concertina Wire And Statue Of Jatra Tana Bhagat In The Campus Of Tana Bhagat Assembly Hall, Gumla Block, District Gumla.
|
Organisation | Government of Jharkhand |
Tender Id | 2023_RDSPL_73656_1 |
Reference Number |
RDD/SD/GUMLA/03/2023-24 Re (4th Call) |
Tender Fee | 2500 |
EMD | 23000 |
Tender Value | |
Place | E. E. Office, R.D.Spl.Div., Gumla. |
Link | https://jharkhandtenders.gov.in |
Start Date | July 21, 2023 19:30 |
End Date |
31/07/2023 ( Expired 692 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Read moreConstruction of mountain museum and planetarium,under member of parliament local area development scheme in pauri constituency of pauri block of pauri garhwal
Construction of mountain &#x0d museum and &#x0d planetarium,under member of &#x0d parliament local area &#x0d development scheme in pauri &#x0d constituency of pauri block of &#x0d pauri garhwal &#x0d
Read moreZone-04, ward-44, construction of false ceiling and tiolet, and laying of paver block at zone office revenue department at chirahula colony.
Zone-04, ward-44, construction of false ceiling and tiolet, and laying of paver block at zone office revenue department at chirahula colony.
Read moreConstruction work of community hall, inter locking tiles, boundary wall and other work in muladas ki kho ward no. 37 file no. 149/25x3/3
Construction work of community hall, inter locking tiles, boundary wall and other work in muladas ki kho ward no. 37 file no. 149/25x3/3
Read moreConstruction of govt. juvenile detention center and juvenile justice board in district lucknow.
Construction of govt. juvenile detention center and juvenile justice board in district lucknow.
Read moreAAAAAAAAAA
Login to viewConstruction of 800 bedded girls hostel (s plus g plus 10), kitchen and dining block (g plus 6) and hvac building (g plus 1) i/c internal water supply, sanitary installation, drainage, sewerage, water supply, u.g. tank (500000 liter), storm water drains, roads paths, internal e.i. fans, wet riser system, fire alarm system, ups system, cctv system, hydro pneumatic water supply system, substation equipment, central ac plant, illuminated signages, street lighting, lifts, horticulture landscaping and other development work bulk services (civil electrical) in main campus at iit(ism) dhanbad (package-i).
Read moreNit no.23_1/wbtdcl of 2025-26 (technical)
Construction of swimming pool with toilet and changing room at murti tourism property in district of jalpaiguri.
Read moreProposed construction of waiting hall and toilet block in girivalam path at arulmigu arunachaleswarar temple, tiruvannamalai
Proposed construction of waiting hall and toilet block in girivalam path at arulmigu arunachaleswarar temple, tiruvannamalai
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreLaying of new paver block from 229/7 to 367/7 and 369/7 to 543/7 in ward no. 25 under zone no. 06
Laying of new paver block from 229/7 to 367/7 and 369/7 to 543/7 in ward no. 25 under zone no. 06
Read moreof your Industry type