Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Rate Contract For Carriage And Disposal Of Excavated Silt/ Earth/ Manure/ Garbage/Cand D Waste Etc...........Direction Of Engineer In Charge (Civil Division No. I, V And Xiii).
|
| Description |
Annual Rate Contract For Carriage And Disposal Of Excavated Silt/ Earth/ Manure/ Garbage/Cand D Waste &Amp#X0d
Etc...........Direction Of Engineer In Charge (Civil Division No. I, V And Xiii).&Amp#X0d
&Amp#X0d
|
| Organisation | Irrigation and Flood Control | State Govt. and UT |
| Tender Id | 2024_IFC_255556_1 |
|
Reference Number |
EE/CD-XIII/Acs./2023-24/169 3rd Call |
| Tender Fee | 0 |
| EMD | 4.18 Lakh |
| Tender Value | - |
| Place | Najafgarh |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=334863 |
| Start Date | March 07, 2024 16:30 |
| End Date |
Expired
12/03/2024
Expired 950 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual clearance of road berm upto premix top level, removing of un-wanted excavated earth/ wet silt from berm and side drains, deep drains having road length of different carriage way 11km. cleaning of premises around estate civil electrical win
Annual clearance of road berm upto premix top level, removing of unwanted excavated earth wet silt from berm and side drains deep drains having road length of different carriage way 11km cleaning of premises around estate civilelect wi
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreAnnual rate contract for carriage and disposal of excavated silt/ earth/ manure/ garbage/candd waste etc. (all kind of soils) ------------------------ per the direction of engineer-in-charge (civil division no. i, v and xiii).
Annual rate contract for carriage and disposal of excavated silt/ earth/ manure/ garbage/candd waste etc. (all kind of soils) ------------------------ per the direction of engineer-in-charge (civil division no. i, v and xiii).
Read moreAnnual rate contract for carriage and disposal of excavated silt/ earth/ manure/ garbage/candd waste etc. (all kind of soils).....flood circle-iv to designated site as per the direction of engineer-in-charge (civil division no. i, v and xiii).
Annual rate contract for carriage and disposal of excavated silt/ earth/ manure/ garbage/candd waste etc. (all kind of soils).....flood circle-iv to designated site as per the direction of engineer-in-charge (civil division no. i, v and xiii).
Read moreDisposal of excavated surplus earth from vvip guest house lucknow
Disposal of excavated surplus earth from vvip guest house lucknow
Read moreDisposal of excavated earth from kinfra hi-tech park ,kalamasserry
Disposal of excavated earth from kinfra hi-tech park ,kalamasserry
Read moreDisposal / removal of excavated silt from barapullah drain civil division- xii.
Disposal / removal of excavated silt from barapullah drain civil division- xii.
Read moreof your Industry type