Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair And Modification Of Various Labs Vi 136, Iv 137 A Etc In Academic Area At Iit Delhi
|
| Description |
Repair And Modification Of Various Labs Vi 136, Iv 137 A Etc In Academic Area At Iit Delhi
|
| Organisation | Director-Indian Institute of Technology(IIT Delhi) | Central Govt. Ministry/Department |
| Tender Id | 2024_IIT_813480_1 |
|
Reference Number |
IITD/WORKS (SP-4678)/2024 |
| Tender Fee | 0 |
| EMD | 87408 |
| Tender Value | - |
| Place | Indian Institute of Technology Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=854904 |
| Start Date | June 25, 2024 21:50 |
| End Date |
Expired
02/07/2024
Expired 831 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection, testing and commissioning of switchyard for 7nos. 33/11 kv sub stations at i) mylaram (vg), (ii) sathapoor (vg), iii) marikal (vg), (iv) rachalapally (vg) v) jedipally (vg), vi) siddapur (vg), and vii) ramajipally (vg), of nagarkurnool circle
Erection, testing and commissioning of switchyard for 7nos. 33/11 kv sub stations at i) mylaram (vg), (ii) sathapoor (vg), iii) marikal (vg), (iv) rachalapally (vg) v) jedipally (vg), vi) siddapur (vg), and vii) ramajipally (vg), of nagarkurnool circle
Read moreErection, testing and commissioning of switchyard for 09nos. 33/11 kv sub stations at i) narreguda(vg), (ii) appaipally(vg), iii) lingampally (regadimylvar) (vg), (iv) polkampally (vg), v) gudur (vg), vi) jaffarpally (vg), vii) pudur (vg), viii) hazipur (vg), and ix) mekavanampally (vg), of vikarabad circle
Erection, testing and commissioning of switchyard for 09nos. 33/11 kv sub stations at i) narreguda(vg), (ii) appaipally(vg), iii) lingampally (regadimylvar) (vg), (iv) polkampally (vg), v) gudur (vg), vi) jaffarpally (vg), vii) pudur (vg), viii) hazipur (vg), and ix) mekavanampally (vg), of vikarabad circle
Read moreConstruction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Read moreErection, testing and commissioning of switchyard for 10nos. 33/11 kv sub stations at i) mutyalampalli(vg), ii) nalvanikunta(vg), iii) polkampally(vg), iv) chinnarevally(vg), v) gollapally(vg), vi)kallepally(vg), vii) munnanur(vg), viii) nakkalabanda(vg), ix) peddapally (vg), and x)gadiryala (vg) of mahabubnagar circle
Erection, testing and commissioning of switchyard for 10nos. 33/11 kv sub stations at i) mutyalampalli(vg), ii) nalvanikunta(vg), iii) polkampally(vg), iv) chinnarevally(vg), v) gollapally(vg), vi)kallepally(vg), vii) munnanur(vg), viii) nakkalabanda(vg), ix) peddapally (vg), and x)gadiryala (vg) of mahabubnagar circle
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreRenovation and modification of central library in academic area at iit
Renovation and modification of central library in academic area at iit
Read moreSetting up dry labs in academic complex east (99c) and academic complex west (99b) at iit delhi.
Setting up dry labs in academic complex east (99c) and academic complex west (99b) at iit delhi.
Read moreRenovation and modification works in various labs / committee rooms in academic area at iit delhi during the year of 2025-2026 (phase-i)
Renovation and modification works in various labs / committee rooms in academic area at iit delhi during the year of 2025-2026 (phase-i)
Read moreRenovation and modification of faculty offices in the academic area at iit delhi
Renovation and modification of faculty offices in the academic area at iit delhi
Read moreRenovation work in various labs/rooms/offices etc. in academic area at iit delhi during the year of 2024-2025 (phase-i)
Renovation work in various labs/rooms/offices etc. in academic area at iit delhi during the year of 2024-2025 (phase-i)
Read moreof your Industry type