Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Invitation For Deep Drilling Project Bid 🏭 The Public Health Engineering (Phe) Department Of The State Government And Union Territories Invites Bids For The Execution Of Deep Drilling, Development, And Stabilization Of 200 Mm Diameter Mini Tube Wells On An Engineering, Procurement, And Construction (Epc) Basis. The Work Will Be Carried Out Using The Odex Method, Which Includes The Provision And Installation Of The Wells. 📅 Bid Submission Deadline: June 21, 2024, 6:00 Pm Tender Fee: Inr 1000 Earnest Money Deposit (Emd): Inr 30,000 Interested Bidders Should Review The Detailed Project Requirements And Submit Their Bids In Accordance With The Bo Q (Bill Of Quantities) Provided. Bids Must Be Accompanied By The Required Tender Fee And Earnest Money Deposit. Keywords: Deep Drilling, Mini Tube Well, Epc Mode, Odex Method, Phe, State Govt. And Ut, Engineering Procurement And Construction, Tender, Bid| Particulars | Details |
|---|---|
| Title |
Deep Drilling, Development And Stabilization Of 200 Mm Dia Mini Tube Well (On Epc Mode) By Odex Method Including Providing, Installation
|
| Description |
Deep Drilling, Development And Stabilization Of 200 Mm Dia Mini Tube Well (On Epc Mode) By Odex Method Including Providing, Installation
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2024_PHE_249368_1 |
|
Reference Number |
e-NIT No. GWD/12 of 2024-25 |
| Tender Fee | 1000 |
| EMD | 30000 |
| Tender Value | |
| Place | AS PER BOQ |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=726197 |
| Start Date | June 08, 2024 19:30 |
| End Date |
Expired
21/06/2024
Expired 717 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of internal infrastructure for integrated manufacturing and logistics cluster at budaun with defect liability period and operation and maintenance for concurrent period of five years on epc mode
Development of internal infrastructure for integrated manufacturing and logistics cluster at budaun with defect liability period and operation and maintenance for concurrent period of five years on epc mode
Read moreDrilling of 15 nos. 150 125 115mm dia 120 mtr. deep vertical telescopic tubewells in different habitations schools aanganwas of block khilchipur district rajgarh including installation of handpumps and construction of cement concrete platform
Drilling of 15 nos. 150 125 115mm dia 120 mtr. deep vertical telescopic tubewells in different habitations schools aanganwas of &#x0d block khilchipur district rajgarh including installation of handpumps and
Read moreDrilling of 15 nos. 150 125 115mm dia 120 mtr. deep vertical telescopic tubewells in different habitations schools aanganwas of block zeerapur district rajgarh including installation of handpumps and construction of cement concrete platforms
Drilling of 15 nos. 150 125 115mm dia 120 mtr. deep vertical telescopic tubewells in different habitations schools aanganwas of &#x0d block zeerapur district rajgarh including installation of handpumps and
Read moreTreatment of potholes on bedar to balnoi road by way of providing and laying of wbm grade-iii,50mm thick bm and 25 mm thick open graded premix carpet including 6mm thick seal coat
Treatment of potholes on bedar to balnoi road by way of providing and laying of wbm grade-iii,50mm thick bm and 25 mm thick open graded premix carpet including 6mm thick seal coat
Read moreDeep drilling, development and stabilization of 200 mm dia mini tube well (on epc mode) by odex method
Deep drilling, development and stabilization of 200 mm dia mini tube well (on epc mode) by odex method
Read moreDeep drilling, development and stabilization of 200 mm dia mini tube well (on epc mode) by odex method
Deep drilling, development and stabilization of 200 mm dia mini tube well (on epc mode) by odex method
Read moreDeep drilling, development and stabilization of 200 mm dia mini tube well (on epc mode) by odex method
Deep drilling, development and stabilization of 200 mm dia mini tube well (on epc mode) by odex method
Read moreDeep drilling, development and stabilization of 200 mm dia mini tube well (on epc mode) by odex method including providing
Deep drilling, development and stabilization of 200 mm dia mini tube well (on epc mode) by odex method including providing
Read moreDeep drilling, development and stabilization of 200 mm dia mini tube well (on epc mode) by odex
Deep drilling, development and stabilization of 200 mm dia mini tube well (on epc mode) by odex
Read moreDeep drilling, development and stabilization of 200 mm dia mini tube wells (on epc mode) by odex method
Deep drilling, development and stabilization of 200 mm dia mini tube wells (on epc mode) by odex method
Read moreof your Industry type