Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
General Psm 2024 2025 Psm 2024 25 Rectification Works To Puthur Di Canal In Between Ch. 3/700 To 4/000 Km General Civil Work
|
Description |
Rectification Works To Puthur Di Canal&Amp#X0d
In Between Ch. 3/700 To 4/000 Km
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2025_Irrig_737156_1 |
Reference Number |
IRR/IA/TR/2549/2024_5_12_11/1 |
Tender Fee | 2760 |
EMD | 35999 |
Tender Value | |
Place | Puthur |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1182540 |
Start Date | February 12, 2025 19:30 |
End Date |
19/02/2025 ( Expired 122 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreMaintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Maintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Read moreMaintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreSupply and stacking of stone boulders, smetal 40 mm, schips 20 mm, 10 mm, and sand for pmt works and smetal 63 mm, 45 mm, 26.5 mm, s/chips 13.2 mm, 6.7 mm and sand for surf work for bp-160 between km 0.000 to 10.000 in the state arunachal pradesh
Supply and stacking of stone boulders, smetal 40 mm, schips 20 mm, 10 mm, and sand for pmt works and smetal 63 mm, 45 mm, 26.5 mm, s/chips 13.2 mm, 6.7 mm and sand for surf work for bp-160 between km 0.000 to 10.000 in the state arunachal pradesh
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read morePeriodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Periodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Read moreof your Industry type