Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Proposed High Level Rcc Bridge Across Kamla River On Bhadhar To Nadiyami Road In Place Of Old Bridge Under Biraul Block In The Dirstrict In Darbhanga
|
Description |
Proposed High Level Rcc Bridge Across Kamla River On Bhadhar To Nadiyami Road In Place Of Old Bridge Under Biraul Block In The Dirstrict In Darbhanga
|
Organisation | National Rural Road Development Agency (NRRDA) |
Tender Id | 2023_ECBIH_127967_1 |
Reference Number |
STATE SCHEME-23-BIRAUL-05 |
Tender Fee | 10000 |
EMD | 10.78 Lakh |
Tender Value | |
Place | RWD PATNA |
Link | https://pmgsytenders.gov.in |
Start Date | September 05, 2023 18:30 |
End Date |
14/09/2023 ( Expired 663 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRepairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreStmc hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29
Short term maintenance contract for hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29 in the state of nagaland in fy 2025-26 percentage rate and work order basis
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreWork of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreConstruction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Read moreSs of crushed s/aggs of various size and s/dust (dry) b/w km 38.00 to km 45.79 on r-r-k road for pmt work (approx 50 percentage qty) under 130 rcc/764 brtf (p) swastik in sikkim job no 309/289.
Ss of crushed s/aggs of various size and s/dust (dry) b/w km 38.00 to km 45.79 on r-r-k road for pmt work (approx 50 percentage qty) under 130 rcc/764 brtf (p) swastik in sikkim job no 309/289.
Read moreBalance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.
Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.
Read moreof your Industry type