Tender Details

Particulars Details
Title
Insulation Works Of Steam Lines, Ducts, Equipment Etc. At Ammonia Plant In Fact Uc
Description
Insulation Works Of Steam Lines, Ducts, Equipment Etc. At Ammonia Plant In Fact Uc&#X0d
Organisation The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department
Tender Id 2024_FACT_789166_1
Reference
Number
3009/2023-2024/E28771
Tender Fee 0
EMD 12000
Tender Value -
Place Udyogamandal, Kerala
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=829490

Start Date January 06, 2024 22:30
End Date
Expired 22/01/2024

Expired 995 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Drinking waterline works from q flat area to jnm area at fact uc township udyogamandal.

Drinking waterline works from q flat area to jnm area at fact uc township udyogamandal.

Read more
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Read more
Providing transformer oil filtration, supply of transformer oil, 11kv horn gap fuses, 95sq.mm lt cable, fencing to sub-station, etc., in place of de-functioning equipment at 11kv/433v at electrical sub-station at division office premises, under eam cell of o and m.division-22, kukatpally zone, cyberabad.

Providing transformer oil filtration, supply of transformer oil, 11kv horn gap fuses, 95sq.mm lt cable, fencing to sub-station, etc., in place of de-functioning equipment at 11kv/433v at electrical sub-station at division office premises, under eam cell of o and m.division-22, kukatpally zone, cyberabad.

Read more
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Insulation work of ducts, equipment etc. at ammonia plants in fact-uc.

Insulation work of ducts, equipment etc. at ammonia plants in fact-uc.

Read more
Insulation works of steam lines, ducts, equipment etc. at pc and hyam plants in fact petro uc.

Insulation works of steam lines, ducts, equipment etc. at pc and hyam plants in fact petro uc.

Read more
Ata 2023- insulation works of steam lines, ducts, equipment etc. at anone and lactam plants in fact petro uc

Ata 2023- insulation works of steam lines, ducts, equipment etc. at anone and lactam plants in fact petro uc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise