Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Insulation Works Of Steam Lines, Ducts, Equipment Etc. At Ammonia Plant In Fact Uc
|
| Description |
Insulation Works Of Steam Lines, Ducts, Equipment Etc. At Ammonia Plant In Fact Uc
|
| Organisation | The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department |
| Tender Id | 2024_FACT_789166_1 |
|
Reference Number |
3009/2023-2024/E28771 |
| Tender Fee | 0 |
| EMD | 12000 |
| Tender Value | - |
| Place | Udyogamandal, Kerala |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=829490 |
| Start Date | January 06, 2024 22:30 |
| End Date |
Expired
22/01/2024
Expired 995 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drinking waterline works from q flat area to jnm area at fact uc township udyogamandal.
Drinking waterline works from q flat area to jnm area at fact uc township udyogamandal.
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreProviding transformer oil filtration, supply of transformer oil, 11kv horn gap fuses, 95sq.mm lt cable, fencing to sub-station, etc., in place of de-functioning equipment at 11kv/433v at electrical sub-station at division office premises, under eam cell of o and m.division-22, kukatpally zone, cyberabad.
Providing transformer oil filtration, supply of transformer oil, 11kv horn gap fuses, 95sq.mm lt cable, fencing to sub-station, etc., in place of de-functioning equipment at 11kv/433v at electrical sub-station at division office premises, under eam cell of o and m.division-22, kukatpally zone, cyberabad.
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreInsulation work of ducts, equipment etc. at ammonia plants in fact-uc.
Insulation work of ducts, equipment etc. at ammonia plants in fact-uc.
Read moreInsulation works of steam lines, ducts, equipment etc. at pc and hyam plants in fact petro uc.
Insulation works of steam lines, ducts, equipment etc. at pc and hyam plants in fact petro uc.
Read moreAta 2023- insulation works of steam lines, ducts, equipment etc. at anone and lactam plants in fact petro uc
Ata 2023- insulation works of steam lines, ducts, equipment etc. at anone and lactam plants in fact petro uc
Read moreof your Industry type