Tender Details

Particulars Details
Title
2271/Bpm/N 179/2024
Description
Preparation Of Base Map In Gis Platform For Surface Drainage System&Amp#X0d And Other Utilities That Crosses Storm Water Drainage Channel And Finding Out Suitable Alignment And Size Of Drainage Leading To Proposed Lifting Station All Over.
Organisation DISTRICT MAGISTRATE DAKSHIN DINAJPUR | State Govt. and UT
Tender Id 2024_DMDD_776470_1
Reference
Number
2271/BPM/N-179/2024
Tender Fee 0
EMD 15000
Tender Value -
Place Different Ward
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1719215

Start Date November 30, 2024 00:25
End Date
Expired 07/12/2024

Expired 673 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment

Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment

Read more
Mtpsi tm uniti replacing the defective main steam stop valves left right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves

Mtpsi tm uniti replacing the defective main steam stop valves left right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves

Read more
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves

Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise