Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing And Fixing Insulation In Existing Mt Gaage At Forward Location Of 5 Th Bn Located At 12600 Ft And 123 Km From Leh Towards Northern Side
|
Description |
Providing And Fixing Insulation In Existing Mt Gaage At Forward Location Of 5 Th Bn Located At 12600 Ft And 123 Km From Leh Towards Northern Side
|
Organisation | DG, Indo-Tibetan Border Police Force | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 48175 |
Tender Value | |
Place | FORWARD POST |
Link |
AAAAAAAAAA Login to view |
Start Date | June 27, 2025 15:30 |
End Date |
17/07/2025 ( 21 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreDemolition of existing rcc buildings such as painting hangar toilet block removal of existing old roof sheets acs and other structure bulows providing area for parking metro cars with covered roofing at eastern side of tatra hangar for parking area
Demolition of existing rcc buildings such as painting hangar toilet block removal of existing old roof sheets acs and other structure bulows providing area for parking metro cars
 with covered roofing at eastern side of tatra hangar for parking area
Read moreConstruction of 220/132 kv, 1x160 mva substation at hemda (upgradation) (distt. jhalawar) bn-9018002509
Construction of 220/132 kv, 1x160 mva substation at hemda (upgradation) (distt. jhalawar) along with associated bays at existing 132 kv gss bakani, raipur, dug and 220 kv gss bhawanimandi on turnkey basis bn-9018002509
Read moreConstruction of surface drain,c.c.road near house of loknath prasad to tarak prasad and house of balmiki sharma to tark paramanik,with nikashi high drain from house of debdas goswami to laxman saha at hazrapara in ward no-20.
Construction of surface drain,c.c.road near house of loknath prasad to tarak prasad and house of balmiki sharma to tark paramanik,with nikashi high drain from house of debdas goswami to laxman saha at hazrapara in ward no-20.
Read moreConstruction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Read moreof your Industry type