Tender Details
Particulars | Details |
---|---|
Title |
Providing And Fixing Tiled Ceiling At Machine Hall At Power House Of Parbati H.E. Project (Stage Ii) (Package No C 808)
|
Description |
Providing And Fixing Tiled Ceiling At Machine Hall At Power House Of Parbati H.E. Project (Stage Ii) (Package No C 808)
|
Organisation | NHPC Limited | Central Govt. Ministry/Department |
Tender Id | 2025_NHPC_852004_1 |
Reference Number |
NH/PP-II/PnC/Pkg. No. C-808/2025 |
Tender Fee | 1180 |
EMD | 1.2 Lakh |
Tender Value | |
Place | Power House of Parbati-II H.E.P.,Sainj,H.P. |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=895780 |
Start Date | March 06, 2025 22:30 |
End Date |
27/03/2025 ( Expired 50 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of pump house and fixing motor and electric pannel at ward no 01 idgah filtter plant
Construction of pump house and fixing motor and electric pannel at ward no 01 idgah filtter plant
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreAnnual overhauling of 10.2 mw capacity hydro machine no. 02 installed at 3x10.2 mw capacity matatila power house lalitpur
Annual overhauling of 10.2 mw capacity hydro machine no. 02 installed at 3x10.2 mw capacity matatila power house lalitpur
Read moreLot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.
Read moreProcurement of l and t make spare contact kit, coil of different power auxiliary contactor, breaker installed at unit 3 and 4, sstpp, stage-ii, dongalia, khandwa on open offer basis with single make of l and t only/etni-ii
Procurement of l and t make spare contact kit, coil of different power auxiliary contactor, breaker installed at unit 3 and 4, sstpp, stage-ii, dongalia, khandwa on open offer basis with single make of l and t only
Read moreProviding and fixing aluminium partition and acp ceiling at adsl lab in academic block a-7 and fesem lab in academic block a-3 at south campus of iit mandi.
Providing and fixing aluminium partition and acp ceiling at adsl lab in academic block a-7 and fesem lab in academic block a-3 at south campus of iit mandi.
Read moreSupply, delivery, installation, testing, commissioning with 3 month trial 5 years operation and maintenance of pumping machineries raw water pumping -6 no of pumps each of (1250 cum/hr.) 415v mcc at pump house, power distribution of th
Supply, delivery, installation, testing, commissioning with 3 month trial 5 years operation and maintenance of pumping machineries raw water pumping -6 no of pumps each of (1250 cum/hr.) 415v mcc at pump house, power distribution of th
Read moreSupply, fabrication, installation, testing and commissioning of main gate of power house, cut out cover railing and staircase railing on different floor of power house of parbati-h.e. project (stage-ii) (package no-c-803-a)
Supply, fabrication, installation, testing and commissioning of main gate of power house, cut out cover railing and staircase railing on different floor of power house of parbati-h.e. project (stage-ii) (package no-c-803-a)
Read moreProviding and fixing the false ceiling and laying of tiles and miscellaneous glass works at nit anp
Providing and fixing the false ceiling and laying of tiles and miscellaneous glass works at nit anp
Read moreRenovation of tg roof stage - ii and different elevation level of power house building at bktps under capex 2025-26.
Renovation of tg roof stage - ii and different elevation level of power house building at bktps under capex 2025-26.&#x0d &#x0d
Read moreof your Industry type