Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ted 554
|
| Description |
Creation Of 06 Six Nos 33 K V Substation Namely 33 K V Substation Sagarpur And Gomla Mori Under Op Circle Narnaul 33 K V Sstns Jeewra Manethi Ransi Majri And Bidawas Under Op Circle Rewari Under Rds Scheme Within The Jurisdiction Of Dhbvnl
|
| Organisation | Haryana Board Corporation | State Govt. and UT |
| Tender Id | 2025_HBC_445989_1 |
|
Reference Number |
20256798828D B21E 472E 891A 90DA947871381033DHB |
| Tender Fee | 6900 |
| EMD | 76.64 Lakh |
| Tender Value | - |
| Place | JEEWRA BIDAWAS RANSI MAJRI MANETHI GOMLA SAGA |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=523448 |
| Start Date | May 12, 2025 23:30 |
| End Date |
Expired
05/06/2025
Expired 494 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of earth pits in sccl 132/33 kv substation, corporate
Construction of earth pits in sccl 132/33 kv substation, corporate
Read moreConstruction of major storm water drain from 33 kv substation to haritha hotel via kerala english medium school in dharmapuri municipality
Construction of major storm water drain from 33 kv substation to haritha hotel via kerala english medium school in dharmapuri municipality
Read moreFixing, testing and commissioning of summation meters at (i) 132/33 kv ss kodandapur (ii) 132 kv sws nasarlapally (iii) 132 kv sws godakondla for hmws and sb in omc circle suryapet.
Fixing, testing and commissioning of summation meters at (i) 132/33 kv ss kodandapur (ii) 132 kv sws nasarlapally (iii) 132 kv sws godakondla for hmws and sb in omc circle suryapet.
Read moreOperation and supply of fuel in dg set along with lube oil and filter replacement in 33/0.433 kv substation at vikas bhawan, patna for one year.
Operation and supply of fuel in dg set along with lube oil and filter replacement in 33/0.433 kv substation at vikas bhawan, patna for one year.
Read moreErection of 33/11kv substation with connected 33kv line at maddimalla (v) in veernapally (m) of karimnagar division of operation circle karimnagar under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv line at maddimalla (v) in veernapally (m) of karimnagar division of operation circle karimnagar under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at thatipally (v) in sirikonda (m) of dichpally division of nizamabad circle under t and d/ si scheme on partial turnkey basis..
Erection of 33/11kv substation with connected 33kv and 11kv lines at thatipally (v) in sirikonda (m) of dichpally division of nizamabad circle under t and d/ si scheme on partial turnkey basis..
Read moreErection, testing and commissioning of 33/11 kv ss switchyard along with connected 33kv and 11kv lines at indrakal village in tadoor(m) of nagarkurnool division in nagarkurnool circle
Erection, testing and commissioning of 33/11 kv ss switchyard along with connected 33kv and 11kv lines at indrakal village in tadoor(m) of nagarkurnool division in nagarkurnool circle
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at markodu (v) in gundala (m) of kothagudem division of operation circle kothagudem under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at markodu (v) in gundala (m) of kothagudem division of operation circle kothagudem under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at laxmipuram (v) in wyra (m) of wyra division of operation khammam circle under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at laxmipuram (v) in wyra (m) of wyra division of operation khammam circle under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at kurla (v) in dongili (m) of banswada division of operation kamareddy circle under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at kurla (v) in dongili (m) of banswada division of operation kamareddy circle under t and d/ si scheme on partial turnkey basis.
Read moreof your Industry type