Tender Details

Particulars Details
Title
Carrying Out Unit 04 Absorber Outlet Ducting Work Including Duct Structure Of Stage Ii At Fgd Project
Description
Carrying Out Unit 04 Absorber Outlet Ducting Work Including Duct Structure Of Stage Ii At Fgd Project
Organisation Bharat Heavy Electricals Limited | Public Sector Undertakings
Tender Id 2024_BHEL_38902_1
Reference
Number
BHE/PW/PUR/RGFGD/Duct/006
Tender Fee 0
EMD 0
Tender Value -
Place 3X200MW 3X500MW FGD Jyothinagar, Ramagundam
Link
View Original Tender Notice

https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=40585

Start Date August 12, 2024 14:30
End Date
Expired 22/08/2024

Expired 782 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site

Dismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site

Read more
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Read more
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Read more
Carrying out the ducting erection, alignment, welding, att work of stage -ii unit-04 at fgd project 3x200 mw 3x500 mw ntpc ramagundam site.

Carrying out the ducting erection, alignment, welding, att work of stage -ii unit-04 at fgd project 3x200 mw 3x500 mw ntpc ramagundam site.

Read more
Carrying out the unit-04 ducting erection, alignment , welding, ndt att work of already pre-assembled duct and alignment , welding, ndt att work of already erected duct at fgd project 3x200 mw 3x500 mw ntpc ramagundam, site

Carrying out the unit-04 ducting erection, alignment , welding, ndt att work of already pre-assembled duct and alignment , welding, ndt att work of already erected duct at fgd project 3x200 mw 3x500 mw ntpc ramagundam, site

Read more
Procurement of absorber and auxiliary tank agitators spares of fgd stage

Procurement of absorber and auxiliary tank agitators spares of fgd stage5 vstps

Read more
Grouting work in rotary equipments of unit -4 absorber at stage- ii fgd

Grouting work in rotary equipments of unit -4 absorber at stage- ii fgd

Read more
Engaging separate agency for part duct work from buf to absorber inlet for unit-4 stage-ii at 3x200mw 3x500mw ntpc ramagundam stage- i and ii, fgd package

Engaging separate agency for part duct work from buf to absorber inlet for unit-4 stage-ii at 3x200mw 3x500mw ntpc ramagundam stage- i and ii, fgd package

Read more
Engaging agency for the welding of unit-4 stage-ii absorber at fgd project

Engaging agency for the welding of unit-4 stage-ii absorber at fgd project

Read more
Design and selection, supply, handling during materials receipt, storage and application including scaffolding, surface preparation, testing, curing and all associated services of glass flake lining in absorber, fgd outlet duct from absorber to chimn

Design and selection, supply, handling during materials receipt, storage and application including scaffolding, surface preparation, testing, curing and all associated services of glass flake lining in absorber, fgd outlet duct from absorber to chimn

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise