Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Carrying Out Unit 04 Absorber Outlet Ducting Work Including Duct Structure Of Stage Ii At Fgd Project
|
| Description |
Carrying Out Unit 04 Absorber Outlet Ducting Work Including Duct Structure Of Stage Ii At Fgd Project
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2024_BHEL_38902_1 |
|
Reference Number |
BHE/PW/PUR/RGFGD/Duct/006 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | 3X200MW 3X500MW FGD Jyothinagar, Ramagundam |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=40585 |
| Start Date | August 12, 2024 14:30 |
| End Date |
Expired
22/08/2024
Expired 782 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Dismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreCarrying out the ducting erection, alignment, welding, att work of stage -ii unit-04 at fgd project 3x200 mw 3x500 mw ntpc ramagundam site.
Carrying out the ducting erection, alignment, welding, att work of stage -ii unit-04 at fgd project 3x200 mw 3x500 mw ntpc ramagundam site.
Read moreCarrying out the unit-04 ducting erection, alignment , welding, ndt att work of already pre-assembled duct and alignment , welding, ndt att work of already erected duct at fgd project 3x200 mw 3x500 mw ntpc ramagundam, site
Carrying out the unit-04 ducting erection, alignment , welding, ndt att work of already pre-assembled duct and alignment , welding, ndt att work of already erected duct at fgd project 3x200 mw 3x500 mw ntpc ramagundam, site
Read moreProcurement of absorber and auxiliary tank agitators spares of fgd stage
Procurement of absorber and auxiliary tank agitators spares of fgd stage5 vstps
Read moreGrouting work in rotary equipments of unit -4 absorber at stage- ii fgd
Grouting work in rotary equipments of unit -4 absorber at stage- ii fgd
Read moreEngaging separate agency for part duct work from buf to absorber inlet for unit-4 stage-ii at 3x200mw 3x500mw ntpc ramagundam stage- i and ii, fgd package
Engaging separate agency for part duct work from buf to absorber inlet for unit-4 stage-ii at 3x200mw 3x500mw ntpc ramagundam stage- i and ii, fgd package
Read moreEngaging agency for the welding of unit-4 stage-ii absorber at fgd project
Engaging agency for the welding of unit-4 stage-ii absorber at fgd project
Read moreDesign and selection, supply, handling during materials receipt, storage and application including scaffolding, surface preparation, testing, curing and all associated services of glass flake lining in absorber, fgd outlet duct from absorber to chimn
Design and selection, supply, handling during materials receipt, storage and application including scaffolding, surface preparation, testing, curing and all associated services of glass flake lining in absorber, fgd outlet duct from absorber to chimn
Read moreof your Industry type