Tender Details

Particulars Details
Title
Mtps I Ca Cws Ii Overhauling Of Existing Id Fan Gearbox For 5 Nos Including Static Balancing Of Fan Blades Painting Of Gear Box Fan Blades Hub And Arm Sleeves Etc In Cooling Tower Stage Ii
Description
Mtps I Ca Cws Ii Overhauling Of Existing Id Fan Gearbox For 5 Nos Including Static Balancing Of Fan Blades Painting Of Gear Box Fan Blades Hub And Arm Sleeves Etc In Cooling Tower Stage Ii
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_501294_1
Reference
Number
CE / MTPS-I / SE / M-I / CA /OT. 254 / 2024-25
Tender Fee 0
EMD 9700
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=596079
Start Date November 14, 2024 23:30
End Date

28/11/2024 ( Expired 166 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtps i ca cws i fabrication of stop log gate 2 nos to provide in outlet canal of unit i cooling tower

Mtps i ca cws i fabrication of stop log gate 2 nos to provide in outlet canal of unit i cooling tower

Read more
Mtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i

Mtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i

Read more
Mtps i ca cws i overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 1a 1b and 1c and allied works

Mtps i ca cws i overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 1a 1b and 1c and allied works

Read more
Mtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i

Mtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i

Read more
Mtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves including painting of ct safety grills etc

Mtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves including painting of ct safety grills etc

Read more
Ttps operation circle mpm ii acp stage i, ii iii cleaning of filters, greasing of bearings, aligning of v belts, checking of bearing performance, conducting static balancing test and renewing of fan blades tie rods, if any failure occurs etc

Ttps operation circle mpm ii acp stage i, ii iii cleaning of filters, greasing of bearings, aligning of v belts, checking of bearing performance, conducting static balancing test and renewing of fan blades tie rods, if any failure occurs etc

Read more
Mtps i ca cws ii overhauling of existing id fan gearbox for 4 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in ct ii

Mtps i ca cws ii overhauling of existing id fan gearbox for 4 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in ct ii

Read more
Mtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii

Mtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii

Read more
Mtps i m i ca cws ii complete dismantling inspection overhaul including renewal of wornout pump components and assembling in any 2 nos of cwp in stage ii

Mtps i m i ca cws ii complete dismantling inspection overhaul including renewal of wornout pump components and assembling in any 2 nos of cwp in stage ii

Read more
Mtps i ca cws ii overhauling of existing id fan gearbox for 5 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in cooling tower stage ii

Mtps i ca cws ii overhauling of existing id fan gearbox for 5 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in cooling tower stage ii

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise