Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Railway Track Upgradation For Lc Point No 202, 203, 204 & 205 At Bpcl Hazira Depot
|
| Description |
As Per Tender Scope Of Work
|
| Organisation | Bharat Petroleum Corporation Limited | Public Sector Undertakings |
| Tender Id | 2024_BPCL_15172 |
|
Reference Number |
1000414277 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Hazira |
| Link |
View Original Tender Notice
https://bpcltenders.eproc.in |
| Start Date | January 19, 2024 20:31 |
| End Date |
Expired
27/01/2024
Expired 995 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Random testing of track fittings at northern railway, track supply depot, ghaziabad.
Random testing of track fittings at northern railway, track supply depot, ghaziabad.
Read moreRepairing of 02 no. track chain and 05 nos. idler of udm machine no. 202 and 203 and sdl 1849 of khandra colliery.
Repairing of 02 no. track chain and 05 nos. idler of udm machine no. 202 and 203 and sdl 1849 of khandra colliery.
Read moreSub work 1: elimination of level crossings gates-lc nos.201, 202 & 204 by constructing road under bridges between surareddipelam - ongole stations by air pushing method with rh girder in vijayawada - gudur section of vijayawada division under south central railway, andhra pradesh, india
Sub work 1: elimination of level crossings gates-lc nos.201, 202 & 204 by constructing road under bridges between surareddipelam - ongole stations by air pushing method with rh girder in vijayawada - gudur section of vijayawada division under south central railway, andhra pradesh, india
Read moreTwo years maintenance contract for railway track leading to tuna from 0 to 11 km dpa line (take off point at 2.573km at gim yard to 13.54km) including lc-1, lc-2 (from 2026-28)
Two years maintenance contract for railway track leading to tuna from 0 to 11 km dpa line (take off point at 2.573km at gim yard to 13.54km) including lc-1, lc-2 (from 2026-28)
Read moreMadurai division: proposed collection and supply of 50mm machine crushed stone ballast at tamaraipadi ballast depot including loading into railway wagons, unloading and spreading in connection with track renewal works in den/north/mdu jurisdiction.
Madurai division: proposed collection and supply of 50mm machine crushed stone ballast at tamaraipadi ballast depot including loading into railway wagons, unloading and spreading in connection with track renewal works in den/north/mdu jurisdiction.
Read moreGear oil part no: s2 g 80w90 in mild steel non-returnable barrels for new track machines. make:- hpcl/iocl/bharat shell/balmer lawrie/bpcl/gulf oil corporation only. (note: as per approved make/brand by recommendation of committee on policy on procurement of spares of track machines available in annexure-ii, vide authority: railway board letter no.2016/track/iii/tk/4 dated 29.06.2016.) to be supplied in non-returnable barrel.
Gear oil part no: s2 g 80w90 in mild steel non-returnable barrels for new track machines. make:- hpcl/iocl/bharat shell/balmer lawrie/bpcl/gulf oil corporation only. (note: as per approved make/brand by recommendation of committee on policy on procurement of spares of track machines available in annexure-ii, vide authority: railway board letter no.2016/track/iii/tk/4 dated 29.06.2016.) to be supplied in non-returnable barrel.
Read moreHiring of machinery for leading of rails, fishplates & other material from various locations over northern railway including shifting of rails and fabricated glued joint and other allied works to facilitate fabrication of insulated glued joints at glued joint workshop, in track depot ghaziabad for a period of two years.
Hiring of machinery for leading of rails, fishplates & other material from various locations over northern railway including shifting of rails and fabricated glued joint and other allied works to facilitate fabrication of insulated glued joints at glued joint workshop, in track depot ghaziabad for a period of two years.
Read moreManufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.
Manufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.
Read moreConstruction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Read moreof your Industry type