Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Day To Day, Extension Etc Of Ht Over Head Line At Haul Road, Face Ob Dumping, Pump Station Etc Under Jarangdih Colliery
|
| Description |
Day To Day, Extension Etc Of Ht Over Head Line At Haul Road, Face Ob Dumping, Pump Station Etc Under Jarangdih Colliery
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_303275_1 |
|
Reference Number |
PE(EnM)/JRD/E-Tender/23-24/116 |
| Tender Fee | 0 |
| EMD | 16000 |
| Tender Value | - |
| Place | Jarangdih Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=314168 |
| Start Date | March 02, 2024 15:30 |
| End Date |
Expired
11/03/2024
Expired 945 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDay to day di, extension, shifting etc of 220 v/440 v over head line at haul road, face ob dumping, pump station etc under jarangdih ocp.
Day to day di, extension, shifting etc of 220 v/440 v over head line at haul road, face ob dumping, pump station etc under jarangdih ocp.
Read moreDi of 6.6 kv o/h line due to widening of haul road ob dumping in old coal face socp under muraidih, amp colliery
Di of 6.6 kv o/h line due to widening of haul road ob dumping in old coal face socp under muraidih, amp 
 colliery
Read moreDismantling and erection of 220v o/h line (coal dump, coal face,haul road,ob dump) at abg colliery
Dismantling and erection of 220v o/h line (coal dump, coal face,haul road,ob dump) at abg colliery
Read moreDi of 33kv overhead line of btps to bandk feeders i and ii routed beside ob dumping area of jarangdih colliery, kathara
Di of 33kv overhead line of btps to bandk feeders i and ii routed beside ob dumping area of jarangdih colliery, kathara
Read moreDay to day erection and dismantling of light fittings, overhead conductor and poles at coal face, ob face, haul road,chp/siding coal stock yard, coal transporting road and ob dump yard at locp,ib valley area
Day to day erection and dismantling of light fittings, overhead conductor and poles at coal face, ob face, haul road,chp/siding coal stock yard, coal transporting road and ob dump yard at locp,ib valley area
Read moreDay to day maintenance of railway track line of jarangdih railway siding under jarangdih colliery (for two years)
Day to day maintenance of railway track line of jarangdih railway siding under jarangdih colliery (for two years)
Read moreof your Industry type