Tender Details
Particulars | Details |
---|---|
Title |
Supply And Fixing Of Crash Barriers Work In Under Road Safety Kathgodam (Ranibagh) Bhimtal Khutani Chaffey Padampuri Dhanachuli Pahadpani Motiyapathar Shahrfatak Maurnaula Devidhura Lohaghat Pancheshwar Sh 10
|
Description |
Supply And Fixing Of Crash Barriers Work In Under Road Safety Kathgodam (Ranibagh) Bhimtal Khutani Chaffey Padampuri Dhanachuli Pahadpani Motiyapathar Shahrfatak Maurnaula Devidhura Lohaghat Pancheshwar Sh 10
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_pwd_69239_1 |
Reference Number |
448/41M 22-23 dated 02-02-2024 |
Tender Fee | 5900 |
EMD | 6.52 Lakh |
Tender Value | |
Place | Bhowali |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=83587 |
Start Date | February 15, 2024 14:30 |
End Date |
27/02/2024 ( Expired 467 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreStrengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Read moreA/r and m.o to residential builiding under division no-3 at nabha estate shimla (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )
A/r and m.o to residential builiding under division no-3 at nabha estate shimla&#x0d (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )&#x0d
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreConstruction of 02 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nabaghunti kirtan math zone-39 asansol under amrut 2.0 phase-iii within amc
Construction of 02 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at nabaghunti kirtan math zone-39 asansol&#x0d under amrut 2.0 phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreWbpwd/pw(r)/se/shc/nit no 06 of 2025-2026(2nd-call)
Bridges at 12.20 km and 12.40 km of shikharpur kulti canal road, repair and rehabilitation work under south 24 parganas highway division in the district of south 24 parganas. project-id-pd252632182s000
Read moreImprovement and cement concrete work of saung khalidhar light vehicle road in kapkot constituency district bageshwar under state sector
Improvement and cement concrete work of saung khalidhar light vehicle road in kapkot constituency district bageshwar under state sector
Read moreStrengthening work by bm/ bc of ghattugad-silogi-gumkhal lansdowne rikhanikhal bironkhal sh-51 motor road km.137.00 to 166.00 in lansdowne constituency of pauri garhwal district under crif.
Strengthening work by bm/ bc of ghattugad-silogi-gumkhal lansdowne rikhanikhal bironkhal sh-51 motor road km.137.00 to 166.00 in lansdowne constituency of pauri garhwal district under crif.
Read moreof your Industry type