Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ejector And Released Service
|
| Description |
Ejector And Released Service
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 13, 2026 02:35 |
| End Date |
Open
06/11/2026
22 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
D7a1z48813 - supply of steam jet air ejector, starting ejector, steam piping and air piping
D7a1z48813 - supply of steam jet air ejector, starting ejector, steam piping and air piping
Read moreSr6001d-(b) ae(i) -064543-001-02 (ejector b(e) (zh) 6, 3 copper)
Sr6001d-(b) ae(i) -064543-001-02 (ejector b(e) (zh) 6, 3 copper)
Read moreMtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems
Mtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems
Read moreTtps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Read moreMtps i mill plant unit ii applying two layers ceramic wear coat eromat at mill outlet elbow released from unit ii during annual overhaul 2026 27
Mtps i mill plant unit ii applying two layers ceramic wear coat eromat at mill outlet elbow released from unit ii during annual overhaul 2026 27
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - installation of ms iron staircase and smoke ejection exhaust at trauma centre smoke ejector service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - installation of ms iron staircase and smoke ejection exhaust at trauma centre smoke ejector service provider
Read moreMtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Read moreof your Industry type