Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Engineering, Manufacture, Supply And Delivery Of New Ip Rotor (With Full Blading) For Turbine Model,C 210 130 (For 210 Mw Unit Of Kolaghat Tps) Through Capex 2025 26
|
| Description |
Design, Engineering, Manufacture, Supply And Delivery Of New Ip Rotor (With Full Blading) For Turbine Model,C 210 130 (For 210 Mw Unit Of Kolaghat Tps) Through Capex 2025 26
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_868258_1 |
|
Reference Number |
WBPDCL/KTPS/NIT/E3391/25-26 |
| Tender Fee | 0 |
| EMD | 39.6 Lakh |
| Tender Value | - |
| Place | Kolaghat Thermal Power Station |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1952182 |
| Start Date | August 04, 2025 17:30 |
| End Date |
Expired
20/08/2025
Expired 423 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spares for hpt assembly fixtures 210 mw kwu turbine
Spares for hpt assembly fixtures 210 mw kwu turbine
Read moreProcurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Procurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Read moreManufacture and supply of roller journal shafts for bhel make xrp-883, 210 mw at ph-iii, atps, chachai
Manufacture and supply of roller journal shafts for bhel make xrp-883, 210 mw at ph-iii, atps, chachai
Read moreProcurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Procurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Read moreProcurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Read moreSupply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x
Supply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - pw 142 the work of vibration analysis of boiler and turbine auxiliaries for 200 210 mw units at gsecl ukai tps bmd 2 as per schedule b and scope of work mentioned in at..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - pw 142 the work of vibration analysis of boiler and turbine auxiliaries for 200 210 mw units at gsecl ukai tps bmd 2 as per schedule b and scope of work mentioned in at..
Read moreWork contract for supply cum application of pad type ceramic fiber blanket insulation for hp and ip turbine modules and associated valves of 2x210 mw in unit no. 1 and 2 of ph i, sgtps, birsinghpur.
Work contract for supply cum application of pad type ceramic fiber blanket insulation for hp and ip turbine modules and associated valves of 2x210 mw in unit no. 1 and 2 of ph i, sgtps, birsinghpur.
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - wt-5250g (tmd-ii) work of attending coil (tube) punctured in hp heaters of 200 - 210 mw units 3 4 and 5 at ukai tps on as and when required basis for the year 2026-27 a..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - wt-5250g (tmd-ii) work of attending coil (tube) punctured in hp heaters of 200 - 210 mw units 3 4 and 5 at ukai tps on as and when required basis for the year 2026-27 a..
Read moreof your Industry type