Tender Details
Particulars | Details |
---|---|
Title |
Mtps I M I Ca Cws I Replacement Of Corroded Worn Out Gi Safety Hand Rails And Toe Guards Inside Ct Id Fan Stack Area And Hot Rolled Sheet In Ct Id Fan Door Of Cooling Tower Unit Ii During Coh 2024 2025
|
Description |
Mtps I M I Ca Cws I Replacement Of Corroded Worn Out Gi Safety Hand Rails And Toe Guards Inside Ct Id Fan Stack Area And Hot Rolled Sheet In Ct Id Fan Door Of Cooling Tower Unit Ii During Coh 2024 2025
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_490632_1 |
Reference Number |
CE / MTPS-I / SE / M-I / CA /OT. 214 / 2024-25 |
Tender Fee | 0 |
EMD | 4200 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=587934 |
Start Date | October 18, 2024 21:30 |
End Date |
24/10/2024 ( Expired 179 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i ca cws ii overhauling of existing id fan gearbox for 4 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in ct ii
Mtps i ca cws ii overhauling of existing id fan gearbox for 4 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in ct ii
Read moreMtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii
Mtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii
Read moreMtps i ca cws ii overhauling of existing id fan gearbox for 5 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in cooling tower stage ii
Mtps i ca cws ii overhauling of existing id fan gearbox for 5 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in cooling tower stage ii
Read moreMtps i bm unit ii coh 2024 25 replacement of the worn out impeller wear liner plates and other related works in id fan 2a including cost of impeller wear liner plate 1 set
Mtps i bm unit ii coh 2024 25 replacement of the worn out impeller wear liner plates and other related works in id fan 2a including cost of impeller wear liner plate 1 set
Read moreMtps i ca cws ii overhauling of existing i.d fan gearbox for 1 no including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in cooling tower iv
Mtps i ca cws ii overhauling of existing i.d fan gearbox for 1 no including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in cooling tower iv
Read moreMtps i m i ca cws i replacement of corroded worn out gi safety hand rails and toe guards inside ct id fan stack area and hot rolled sheet in ct id fan door of cooling tower unit ii during coh 2024 2025
Mtps i m i ca cws i replacement of corroded worn out gi safety hand rails and toe guards inside ct id fan stack area and hot rolled sheet in ct id fan door of cooling tower unit ii during coh 2024 2025
Read moreMtps i m i ca cws i strengthening and reconditioning of western side eroded corroded sun shield roof structure and its doors provided over hot water basin in cooling tower ii and allied works
Mtps i m i ca cws i strengthening and reconditioning of western side eroded corroded sun shield roof structure and its doors provided over hot water basin in cooling tower ii and allied works
Read moreMtps i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of worn out spares during coh 2024 2025 of unit ii
Mtps i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of worn out spares during coh 2024 2025 of unit ii
Read moreMtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Mtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Read moreMtps i ca cws ii strengthening and renewal of the most damaged corroded and eroded portion of existing hot water header pipes of various size including painting in cooing tower iv during aoh of unit iv
Mtps i ca cws ii strengthening and renewal of the most damaged corroded and eroded portion of existing hot water header pipes of various size including painting in cooing tower iv during aoh of unit iv
Read moreof your Industry type