Tender Details

Particulars Details
Title
Assistance Required For Dust Suppression In All Running Faces In District Of Lws And Bagdona Seam At Tawa Ii Mine, Pathakhera Area, Wcl
Description
Assistance Required For Dust Suppression In All Running Faces In District Of Lws And Bagdona Seam At Tawa Ii Mine, Pathakhera Area, Wcl
Organisation Western Coalfields Limited | Public Sector Undertakings
Tender Id 2025_WCL_335470_1
Reference
Number
PK3550-E-MIN-0009-2025-26
Tender Fee 0
EMD 52900
Tender Value
Place Tawa-II Mine, Pathakhera Area, WCL
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=347760
Start Date May 15, 2025 23:30
End Date

26/05/2025 ( Expired 10 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas

Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas

Read more
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.

Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.

Read more
Lot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india

Read more
Arrangement of 33kv bus sectionalizer isolator for bifurcation of 33kv bus between ptr-i and ptr-iii at 132/33kv substation manoharabad in medak district.

Arrangement of 33kv bus sectionalizer isolator for bifurcation of 33kv bus between ptr-i and ptr-iii at 132/33kv substation manoharabad in medak district.

Read more
Engagement of consultant for preparation of design, drawing and detailed engineering of comprehensive dust suppression scheme inside dock at haldia dock complex, syama prasad mookerjee port, kolkata.

Engagement of consultant for preparation of design, drawing and detailed engineering of comprehensive dust suppression scheme inside dock at haldia dock complex, syama prasad mookerjee port, kolkata.

Read more
Sale of shop site no s1 stage 2 at 150 ads perianaickenpalayam village coimbatore district

E-tender cum e- auction for commercial site of shop site no. spd-iii/cbe 01/ s1 at 150 area development scheme (stage-ii) in perianaickenpalayam village in coimbatore district.

Read more
8146/gwl/e8 provn of boundary fence at gwalior mil stn (ph-ii) and provn of septic tank in the area of age b/r-ii under ge gwalior

8146/gwl/e8 provn of boundary fence at gwalior mil stn (ph-ii) and provn of septic tank in the area of age b/r-ii under ge gwalior

Read more
Expression of interest (eoi) for running of (i) ready-to-eat (rte), (ii) traditional foods products and (iii) bakery products pilot plants on monthly license basis in niftem campus

Expression of interest (eoi) for running of (i) ready-to-eat (rte), (ii) traditional foods products and (iii) bakery products pilot plants on monthly license basis in niftem campus

Read more
Operation and maintenance of 20 kld pre fabricated waste water treatment recycling plant at aob in port area.

Operation and maintenance of 20 kld single composite compact modular type pmtr pre fabricated waste water treatment recycling plant wwtrp for a period of 5 years at aob in port area.

Read more
Construction of permanent building for district fire office building and fire and rescue service station with development works at erode in erode district.

Construction of permanent building for district fire office building and fire and rescue service station with development works at erode in erode district.&amp#x0d &amp#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise