Tender Details
About Tender
π Comprehensive Bid Invitation For Railway Infrastructure Projects π οΈπ§ The Ministry Of Railways, Central Government, Invites Bids For A Wide Array Of Railway Infrastructure Projects, Including: ποΈ Earthwork And Blanketing In Embankment/Cutting For Bg Line Formation. π Construction Of Bridge Works (Major/Minor) Including Substructure And Superstructure. π€οΈ Construction Of Approach Roads, Retaining Walls, Boundary Walls, Toe Walls, And Drainage Systems. ποΈ Supply And Spreading Of Machine Crushed Stone Ballast. π§ Laying And Linking Of Broad Gauge (Bg) Tracks For Main Lines, Loop Lines, And Points And Crossings. π Bid Submission Deadline: July 16, 2024, 3:00 Pm π° Earnest Money Deposit (Emd): Inr 10,00,000 Interested Bidders Should Review The Complete Tender Document For Detailed Specifications, Terms, And Conditions. Keywords: Railway Infrastructure, Earthwork, Bridge Construction, Track Laying, Ministry Of Railways, Government Tender, Emd, Bid SubmissionParticulars | Details |
---|---|
Title |
(I) Earthwork &Amp Blanketing In Embankment /Cutting In Formation Of Bg Line Including Bridge &Amp Tunnel Approaches Etc., Construction Of Bridge Work (Major/Minor Sub Structure And Super Structure) As Per Railway S Approved Design And Drawing, Construction Of Approach Road/Retaining/Boundary/Toe Wall/Di Drain, Supply &Amp Spreading Of Machine Crushed Stone Ballast, Laying And Linking Of Bg Track For Main Line, Loop Lines And Points &Amp Crossing Etc. In Section, Transportati
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75026443 |
Reference Number |
DADN-SWD-RKGC-12 |
Tender Fee | 0 |
EMD | 1 Crore |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75026443/viewNitPdf_4564526.pdf |
Start Date | June 05, 2024 23:53 |
End Date |
16/07/2024 ( Expired 279 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Read moreCivil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Civil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Read moreEarthwork in railway formation including filling and cutting, blanketing and construction of major and minor bridges, box pushing, p-way track linking including supply of railway track ballast and p-way materials, fittings, point and crossing, drain
Earthwork in railway formation including filling and cutting, blanketing and construction of major and minor bridges, box pushing, p-way track linking including supply of railway track ballast and p-way materials, fittings, point and crossing, drain
Read moreExecution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p-way fittings, track ballast, psc sleeper and points and crossings in connection with construction of railway infrastructure for
Execution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p-way fittings, track ballast, psc sleeper and points and crossings in connection with construction of railway infrastructure for
Read moreExecution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p. way fittings, track ballast, psc sleeper and points and crossings, construction of ei building in connection with construction
Execution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p. way fittings, track ballast, psc sleeper and points and crossings, construction of ei building in connection with construction
Read moreConstruction of formation work, track linking work including supply of track ballast, thick web switch, gj, sej etc for ni work at chakradharnagar proposed new crossing station in between raigarh-kotarlia station for ntpc-lara raigarh
Construction of formation work, track linking work including supply of track ballast, thick web switch, gj, sej etc for ni work at chakradharnagar proposed new crossing station in between raigarh kotarlia station for ntpc-lara raigarh
Read moreEarthwork in formation, blanketing, rub/lhs, minor bridges, extension of passenger platform, road work, retaining/ toe wall, supply of 50 mm machine crushed stone ballast including track linking works at chandkheda - in connection with inter section no. 5 between geratpur-sanand & botad ahmedabad new line and providing y connectivity between sabarmati a and asarwa
For complete deion and other details, please refer to tender
Read moreExecution of various works i.e. earthwork in formation/cutting, blanketting, construction of minor bridges i.e. rcc box, pitching, toe wall, retaining wall, construction of staff quarters and other structures, goods platforms, covering shed, circulating area, laying and linking of broad gauge loop lines including points and crossings, tamping of track, transportation of p. way material, supply and stacking of stone ballast and other incidental activities for providing 2 bg goods loading line
For complete deion and other details, please refer to tender
Read moreEarthwork in formation for railway bg embankment, blanketing work as per rdso specification in revised alignment (ch. 13.6 km to 15.0 km, ch.-15.5 km to 17.8 km and 24.5 km to 27.9 km), superstructure of bridge no.-06 (owg-1x30.5m), construction of rcc retaining wall and drain, protection work, 3 nos of gate goomty, 4 nos of loc huts, 2 nos of oc huts, 3 nos of auto huts manufacturing, supplying & stacking of 50 mm size of machine crushed track ballast of approved quality conforming to l
For complete deion and other details, please refer to tender
Read moreJob 2 construction of link road marwari to joh via sandhani km. 0-0 to 3-870 including bridge on swan river at rd 0-142 sub head construction of bridge sub structure, super structure, approaches and m.t in bridge approaches under nabard ridf-xxx
Job 2 construction of link road marwari to joh via sandhani km. 0-0 to 3-870 including bridge on swan river at rd 0-142 sub head construction of bridge sub structure, super structure, approaches and m.t in bridge approaches under nabard ridf-xxx
Read moreof your Industry type