Construction Of Rcc Compound Wall For Anjur Land And Construction Of Concrete Road At Mankoli Mbr Entrance Road And Anjur Pipeline Steel Bridge And Furniture And Other Works At New Patlipada Unit Ii Office.
|
Description |
Construction Of Rcc Compound Wall For Anjur Land And Construction Of Concrete Road At Mankoli Mbr Entrance Road And Anjur Pipeline Steel Bridge And Furniture And Other Works At New Patlipada Unit Ii Office.
|
Organisation | STEM Water Distribution and Infrastructure Company Thane | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1680 |
EMD | 1.5 Lakh |
Tender Value | |
Place | STEM, Thane |
Link |
AAAAAAAAAA Login to view |
Start Date | June 04, 2025 22:30 |
End Date |
19/06/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of approach road and other misc. civil works for residences at 220 kv s/s farrukhabad. (p.r. no. 1300065621/2025)
Construction of approach road and other misc. civil works for residences at 220 kv s/s farrukhabad. (p.r. no. 1300065621/2025)
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreCa no ge(n)amb-16/2025-26 repair to fencing, compound wall, hard standing, drain and other allied works in jcos/ors md accn and other areas of age b/r-ii under ge (north) ambala cantt
Ca no ge(n)amb-16/2025-26 repair to fencing, compound wall, hard standing, drain and other 
 allied works in jcos/ors md accn and other areas of age b/r-ii under ge (north) ambala cantt 
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at barakar health centre zone-24 kulti under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at barakar health centre zone-24 kulti under amrut&#x0d 2.0 phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of boudary wall on new land behind hvj pipeline yard township and ab raod boundary
Construction of boudary wall on new land behind hvj pipeline yard township and ab raod boundary wall at gail vijaipur
Read moreSupplying laying and spreading of crushed stone over a layer of cement,sand,and brick khoa mix and other associated works at lv side portion switchyard of 3rd 31.5 mva transformer at new bishnupur 220 kv substation under bankura area office,wbsetcl
Supplying laying and spreading of crushed stone over a layer of cement,sand,and brick khoa mix and other associated works at lv side portion switchyard of 3rd 31.5 mva transformer at new bishnupur 220 kv substation under bankura area office,wbsetcl
Read moreConstruction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Construction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Read moreof your Industry type