Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Earthwork In Formation, Blanketing, Rub/Lhs, Minor Bridges, Extension Of Passenger Platform, Road Work, Retaining/ Toe Wall, Supply Of 50 Mm Machine Crushed Stone Ballast Including Track Linking Works At Chandkheda In Connection With Inter Section No. 5 Between Geratpur Sanand &Amp Botad Ahmedabad New Line And Providing Y Connectivity Between Sabarmati A And Asarwa
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79056393 |
|
Reference Number |
DYCECIIADI-5InterSec-01 |
| Tender Fee | 0 |
| EMD | 8.09 Lakh |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79056393/viewNitPdf_4807945.pdf |
| Start Date | December 24, 2024 22:49 |
| End Date |
Expired
16/01/2025
Expired 638 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Balance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.
Balance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.
Read moreBalance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.
Balance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.
Read moreConstruction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i
Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i
Read moreConstruction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica
Construction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica
Read moreConstruction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division
Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division
Read moreExecution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Read moreShoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Read moreConstruction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Read moreJeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Read moreStrengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o
Strengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o
Read moreof your Industry type