Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fabrication And Erection Of Suction And Discharge Piping Of 3 Nos. Chilled Water And Condenser Water Pumps, Dismantling Of 1 No. Of Old Chilled Water Pump Including Supply And Erection New Pump At Karp Chilling Plant
|
| Description |
Fabrication And Erection Of Suction And Discharge Piping Of 3 Nos. Chilled Water And Condenser Water Pumps, Dismantling Of 1 No. Of Old Chilled Water Pump Including Supply And Erection New Pump At Karp Chilling Plant
|
| Organisation | Bhabha Atomic Research Centre | Central Govt. Ministry/Department |
| Tender Id | 2024_BARC_821858_1 |
|
Reference Number |
BARCF/INRPK-MA/KA/TR/245/2024 |
| Tender Fee | 0 |
| EMD | 61346 |
| Tender Value | - |
| Place | Kalpakkam |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=863711 |
| Start Date | September 02, 2024 16:30 |
| End Date |
Expired
19/09/2024
Expired 759 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rubber bellow dn500 length 200 mm for chilled /condenser water p/p suction line,rubber bellow dn400 length 200 mm for chilled/condenser water p/p discharge line,rubber bellow size dn300 length 200 mm for cccw pump suction line,rubber bellow size dn250 length 200 mm for cccw pump discharge line
Rubber bellow dn500 length 200 mm for chilled /condenser water p/p suction line,rubber bellow dn400 length 200 mm for chilled/condenser water p/p discharge line,rubber bellow size dn300 length 200 mm for cccw pump suction line,rubber bellow size dn250 length 200 mm for cccw pump discharge line
Read moreMtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical
Mtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical
Read moreDismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Dismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Read moreSupplying , installation, testing and commissioning 2t split ac,supplying , installation, testing and commissioning 1.5t split ac,timer to change over the acs,copper piping suction,copper piping discharge,4 core copper cable,miscellaneous works for new hcs room,miscellaneous works for dr. girish culture room,miscellaneous works for freezer space
Supplying , installation, testing and commissioning 2t split ac,supplying , installation, testing and commissioning 1.5t split ac,timer to change over the acs,copper piping suction,copper piping discharge,4 core copper cable,miscellaneous works for new hcs room,miscellaneous works for dr. girish culture room,miscellaneous works for freezer space
Read moreTemperature thermometer,drier core,atu v belt,condenser end cover gasket,zinc anode with brass cap,vibration mounting for atu,vibration eliminator,vibration eliminator,compressor oil,suction pressure guage,discharge pressure guage,posv valve with coil,atu cooling thermostat,ahu blower bearing with sleeve and locking arranging,high pressure cut out,water flow switch,expansion valve,angle valve,hand shut off valve 3 by 8,angle valve 5 by 8,low pressure cut out switch,condenser safety valve
Temperature thermometer,drier core,atu v belt,condenser end cover gasket,zinc anode with brass cap,vibration mounting for atu,vibration eliminator,vibration eliminator,compressor oil,suction pressure guage,discharge pressure guage,posv valve with coil,atu cooling thermostat,ahu blower bearing with sleeve and locking arranging,high pressure cut out,water flow switch,expansion valve,angle valve,hand shut off valve 3 by 8,angle valve 5 by 8,low pressure cut out switch,condenser safety valve
Read moreSitc of 11 tr ductable split air conditioner comprising of indoor and outdoor units make daikin blue star hitachi carrier voltas including duct modification in indoor unit as per requirement,supply of copper refrigerant piping suction and liquid line of suitable size with closed cell elastomeric insulation including fittings and supports,supply of electrical power cable and control wiring between indoor and outdoor units including termination and labeling,supply of pvc drain piping 32 mm dia with insulation supports and accessories,refrigerant gas charging and nitrogen testing,outdoor unit stand of heavy duty fabricated with mild steel,canvas connection,dismantling of old ductable ac and installation and commissioning charges of 11 tr ductable air conditioner.,buyback of old ductable ac of 11 tr
Sitc of 11 tr ductable split air conditioner comprising of indoor and outdoor units make daikin blue star hitachi carrier voltas including duct modification in indoor unit as per requirement,supply of copper refrigerant piping suction and liquid line of suitable size with closed cell elastomeric insulation including fittings and supports,supply of electrical power cable and control wiring between indoor and outdoor units including termination and labeling,supply of pvc drain piping 32 mm dia with insulation supports and accessories,refrigerant gas charging and nitrogen testing,outdoor unit stand of heavy duty fabricated with mild steel,canvas connection,dismantling of old ductable ac and installation and commissioning charges of 11 tr ductable air conditioner.,buyback of old ductable ac of 11 tr
Read moreManual excavation,excavation- hard rock,rcc breaking or dismantling,pcc m15 - sply and laying,rcc m25 - sply and laying,reinforcement steel,design, sply of chimney- height 8.0mtr,design, sply blower - 10000 cfm,design, sply flp motor suitable capacity,design and sply of suction hood,supply of damper,supply of manometer,design, sply of 20swg gi spiral duct,sply and fab structrual steel supports,erection and commng of ves,dismant and removal of 20 swg old ducts
Manual excavation,excavation- hard rock,rcc breaking or dismantling,pcc m15 - sply and laying,rcc m25 - sply and laying,reinforcement steel,design, sply of chimney- height 8.0mtr,design, sply blower - 10000 cfm,design, sply flp motor suitable capacity,design and sply of suction hood,supply of damper,supply of manometer,design, sply of 20swg gi spiral duct,sply and fab structrual steel supports,erection and commng of ves,dismant and removal of 20 swg old ducts
Read moreSupply, erection and testing of chilled water piping from central water chilling plant to core sub assembly plant at frfcf site, kalpakkam
Supply, erection and testing of chilled water piping from central water chilling plant to core sub assembly plant at frfcf site, kalpakkam
Read moreProcurement of spares for condenser and chilled water pumps installed in
Procurement of spares for condenser and chilled water pumps installed ingcr at mtps kanti muzaffarpur
Read moreRepair/replacement of condenser and chilled water piping, cooling tower, ahu and allied works at airport express line.
Repair/replacement of condenser and chilled water piping, cooling tower, ahu and allied works at airport express line.
Read moreof your Industry type