Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Tanker Lorry Water On Hire Basis Supply To Streets In Tambaram City Municipal Corporation Zone No.01
|
Description |
Supply Of Tanker Lorry Water On Hire Basis Supply To Streets In Tambaram City Municipal Corporation Zone No.01
|
Organisation | Directorate Of Municipal Administration | State Govt. and UT |
Tender Id | 2025_DMA_556704_1 |
Reference Number |
1832/2025/E1 |
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | Zone -1 Area |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=664941 |
Start Date | May 12, 2025 14:30 |
End Date |
23/05/2025 ( Expired 13 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConsultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Consultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read moreConstruction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Read moreIe services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Read moreof your Industry type