Providing, Installing Commissioning And Giving Satisfactory Test And Trial Of 20 K Wp Capacity On Grid Solar Power Pack At Collector Office, Ahilyanagar
|
Description |
Providing, Installing Commissioning And Giving Satisfactory Test And Trial Of 20 K Wp Capacity On Grid Solar Power Pack At Collector Office, Ahilyanagar
|
Organisation | Ahmednagar Municipal Corporation | State Govt. and UT |
Tender Id | 2025_ANMC_1173361_1 |
Reference Number |
AMC/ElectDept/NDVSY/13/2025-26 |
Tender Fee | 1090 |
EMD | 18472 |
Tender Value | |
Place | AMC |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2038736 |
Start Date | April 23, 2025 23:15 |
End Date |
07/05/2025 ( Expired 37 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia
2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia
Read moreProviding installation testing and commissioning of 25 kwp off grid solar power plant at bops sherpur ghoga and fatehpur of 183 bn bops chhanmulla fwd kakkar and rear kakkar of 22 bn bops daoke kahangarh rajatal mahwa of 144 bn bops mohinder n/dhall
Providing installation testing and commissioning of 25 kwp off grid solar power plant at bops sherpur ghoga and fatehpur of 183 bn bops chhanmulla fwd kakkar and rear kakkar of 22 bn bops daoke kahangarh rajatal mahwa of 144 bn bops mohinder n/dhall
Read moreSupply installation testing commissioning of 700 kwp grid tied rooftop solar pv system and five year maintenance
Supply installation testing commissioning of 700 kwp grid tied rooftop solar pv system and five-year maintenance
Read moreSupply, installation, testing and commissioning of grid connected rooftop and ground mounted solar power plants on government buildings
Supply, installation, testing and commissioning of grid connected rooftop and ground mounted solar power plants on government buildings
Read moreInstallation and commissioning of grid connected rooftop solar power plants in tripura
Design, manufacture, supply, erection, testing and commissioning of cumulative capacity up to 10 mw grid connected rooftop solar power plants including 10 years warranty/guarantee, amc at government establishments in tripura on turn-key basis
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreSitc of 145 kwp grid connecting roof top solar power plant without battery backup at lic bo at dhenkanal(20 kwp) talcher(25kwp), jaleswar (25kwp), rairangpur (25 kwp),nuapada (25 kwp), phulbani(20kwp) under cuttack and berhampur do.
Sitc of 145 kwp grid connecting roof top solar power plant without battery backup at lic bo at dhenkanal(20 kwp) talcher(25kwp), jaleswar (25kwp), rairangpur (25 kwp),nuapada (25 kwp), phulbani(20kwp) under cuttack and berhampur do.
Read moreSitc of 95 kwp solar power plant without battery backup at lic branch office under sambalpur do
Sitc of 95 kwp grid connecting roof top solar power plant without battery backup at lic branch office building at padampur(25 kwp) ,titlagarh(25kwp),kuchinda(25kwp),bonai (20 kwp) under sambalpur do
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreSurvey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Survey site investigationdetailed design construction procurement and installation of required machinery equipment and instruments testing commissioning o and m of 10 years of 5 mld capacity zld based cetp at kalibeti khurdha on turnkey basis
Read moreof your Industry type