Tender Details
About Tender
🌉 Invitation For Bids: Steel Trussed Girder Bridge Construction 🛠️🌉 The Public Works Department (Pwd), State Govt. And Ut, Invites Bids From Experienced Contractors For The Design And Construction Of A 1x50 Mtr Span Steel Trussed Girder Bridge Over Nallah Sindh At Ahangar Mohalla Gadoora In Ganderbal. The Project Includes A 7.5 Meter Carriageway Under The Engineering, Procurement, And Construction (Epc) Mode. 📅 Bid Submission Deadline: July 26, 2024, 4:00 Pm Tender Fee: Inr 8500 Earnest Money Deposit (Emd): Inr 14,94,000 Bidders Must Demonstrate Their Capability To Deliver High Quality Infrastructure Projects, Adhering To The Project Specifications And Timelines. Detailed Proposals, Including Design Concepts, Cost Estimates, And Project Execution Plans, Are To Be Submitted. Keywords: Bridge Construction, Steel Trussed Girder Bridge, Epc Mode, Pwd, State Govt. And Ut, Infrastructure Project, Ganderbal, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Design And Construction Of 1x50 Mtr Span Steel Trussed Girder Bridge Over Nallah Sindh At Ahangar Mohalla Gadoora On Epc Mode Engineering Procurement And Construction Mode With 7.5 Mtr Carriage Way.
|
Description |
Design And Construction Of 1x50 Mtr Span Steel Trussed Girder Bridge Over Nallah Sindh At Ahangar Mohalla Gadoora On Epc Mode Engineering Procurement And Construction Mode With 7.5 Mtr Carriage Way.
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWDJK_251991_1 |
Reference Number |
NIT No.22-2024-25 |
Tender Fee | 8500 |
EMD | 14.94 Lakh |
Tender Value | |
Place | Ganderbal |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=732544 |
Start Date | July 04, 2024 17:30 |
End Date |
26/07/2024 ( Expired 268 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Read moreDesign and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreDesign, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreFabrication , launching and commissioning of 20mtr span single lane steel girder bridge over tangtse nallah at klabuk mohallah yerath ( under distt capex )
Fabrication , launching and commissioning of 20mtr span single lane steel girder bridge over tangtse nallah at klabuk mohallah yerath ( under distt capex )
Read moreDesign engineering and procurement of construction of 200 bedded district hospital at district sitapur uttar pradesh on epc mode
Design engineering and procurement of construction of 200 bedded district hospital at district sitapur uttar pradesh on epc mode
Read moreDesign engineering and procurement of construction of international exhibition cum convention centre for 10000 people in avadh vihar yojna district lucknow up on epc mode
Design engineering and procurement of construction of international exhibition cum convention centre for 10000 people in avadh vihar yojna district lucknow up on epc mode
Read moreDesign engineering and procurement of construction of night safari and adventure park phase i in kukrail forest area in district lucknow uttar pradesh on epc mode
Design engineering and procurement of construction of night safari and adventure park phase i in kukrail forest area in district lucknow uttar pradesh on epc mode
Read moreof your Industry type