Tender Details

Particulars Details
Title
Irrigation Precautionary Measure For Khatra Main Canal (Lower) From Ch. 0.00 To Ch. 470.00, Garhbeta Branch Canal From Ch. 0.00 To Ch. 51.00 And Midnapore Branch Canal Ch. 0.00 To Ch. 446.00 In Connection With Kharif Irrigation 2024 (1st, 2nd Wateri
Description
Irrigation Precautionary Measure For Khatra Main Canal (Lower) From Ch. 0.00 To Ch. 470.00, Garhbeta Branch Canal From Ch. 0.00 To Ch. 51.00 And Midnapore Branch Canal Ch. 0.00 To Ch. 446.00 In Connection With Kharif Irrigation 2024 (1st, 2nd Wateri
Organisation IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT
Tender Id 2024_IWD_725919_1
Reference
Number
WBIW/SDO/KCSD-IV/e-NIT- 02(e)/2024-25
Tender Fee 0
EMD 8002
Tender Value
Place KCSD-IV, Sarenga Bankura
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1599806
Start Date August 06, 2024 16:30
End Date

13/08/2024 ( Expired 275 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Read more
Laying of clear water rising main pipe line from rwss tapping point to wtp bellaguntha in connection with sharing of drinking water from rwss for water supply to bellaguntha nac under aap 2024-25

Laying of clear water rising main pipe line from rwss tapping point to wtp bellaguntha in connection with sharing of drinking water from rwss for water supply to bellaguntha nac under aap 2024-25

Read more
Maintenance of lift room,toilets, washbasins including scavenging works in gf,1st and 2nd floor of the central office complex main building at tatabad, cbe for the period of 3 months from 01.06.2025 or from the date of utilization whichever is later.

Maintenance of lift room,toilets, washbasins including scavenging works in gf,1st and 2nd floor of the central office complex main building at tatabad, cbe for the period of 3 months from 01.06.2025 or from the date of utilization whichever is later.

Read more
Securing of row for four/six lane greenfield ludhiana rupnagar nh 205k from junction with ne5 near to manewal to junction with nh 205 near bheora village in the state of punjab on ham,pkg 2 ch 37.7 to ch 66.7 and spur from km 0.0 to km 18.5

Securing of row for four/six lane greenfield ludhiana rupnagar nh 205k from junction with ne5 near to manewal to junction with nh 205 near bheora village in the state of punjab on ham,pkg 2 ch 37.7 to ch 66.7 and spur from km 0.0 to km 18.5

Read more
For removal of deposited earth in main canal ch. 348 to 358 and ch. 630 to 650 and left side bank raising repair work

For removal of deposited earth in main canal ch. 348 to 358 and ch. 630 to 650 and left side bank raising repair work

Read more
Laying of clear water rising main pipe line in connection with sharing of drinking water from rwss for water supply to polasara nac under aap 2024-25 (basudha)

Laying of clear water rising main pipe line in connection with sharing of drinking water from rwss for water supply to polasara nac under aap 2024-25 (basudha)

Read more
Const. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi canal road near siba sakti club to main road nh side in connection with s/s, under watco section ggp colony, bbsr

Const. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi canal road near siba sakti club to main road nh side in connection with s/s, under watco section ggp colony, bbsr

Read more
Preparation of detailed project report in connection with up gradation of the road from bungkulung to ambotia fatak for length of 16.50 km along with road safety and protective works

Preparation of detailed project report in connection with up gradation of the road from bungkulung to ambotia fatak for length of 16.50 km along with road safety and protective works

Read more
Consultancy services for preparation of dpr for widening and upgradation of ambedkar nagar to raebareli section of nh 128 from dc km 0.00 to km 148.980 and ayodhya prayagraj section from ch. km 82.000 to km 95.100 of nh 330 in uttar pradesh

Consultancy services for preparation of dpr for widening and upgradation of ambedkar nagar to raebareli section of nh 128 from dc km 0.00 to km 148.980 and ayodhya prayagraj section from ch. km 82.000 to km 95.100 of nh 330 in uttar pradesh

Read more
Laying of clear water rising main pipe line in connection with sharing of drinking water from rwss for water supply to buguda nac under basudha

Laying of clear water rising main pipe line in connection with sharing of drinking water from rwss for water supply to buguda nac under basudha

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise