Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hubballi Division: Provision Of Quick Watering System Between Road 1 & 2 And Road 3 & 4 At Vijayapura (Bjp) Station (Maintenance Period 12 Months).
|
| Description |
Hubballi Division: Provision Of Quick Watering System Between Road 1 & 2 And Road 3 & 4 At Vijayapura (Bjp) Station (Maintenance Period 12 Months).
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | September 29, 2026 22:51 |
| End Date |
Open
23/10/2026
8 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Civil engineering work in connection with provision of quick watering arrangement at jsg station.
Civil engineering work in connection with provision of quick watering arrangement at jsg station.
Read moreProvision of quick watering arrangement at pf no. 3/4 & 5 at rajkot station.
Provision of quick watering arrangement at pf no. 3/4 & 5 at rajkot station.
Read moreHubballi division-improvements to approach road for rub 237a at km.482/345 at navalur yard between ubl-ld section. (maintenance period - 12 months).
Hubballi division-improvements to approach road for rub 237a at km.482/345 at navalur yard between ubl-ld section. (maintenance period - 12 months).
Read moreCamc of quick watering system installed at bju station for a period of 03 years
Camc of quick watering system installed at bju station for a period of 03 years
Read morePodannur-provision of watering and oea facilities between pf 1&2,3&4 and pf5 at ptj jn
Podannur-provision of watering and oea facilities between pf 1&2,3&4 and pf5 at ptj jn
Read moreHubballi division: proposed construction of station approach road along with storm water drain and improvements to land scaping in lower circulating area at hubballi railway station.(maintenance period:12 months)
Hubballi division: proposed construction of station approach road along with storm water drain and improvements to land scaping in lower circulating area at hubballi railway station.(maintenance period:12 months)
Read moreHubballi division: hubballi-alnawar-cess widening for a total length of 41.99 rkm,(maintenance period : 01 year)(two packet system)
Hubballi division: hubballi-alnawar-cess widening for a total length of 41.99 rkm,(maintenance period : 01 year)(two packet system)
Read moreElectrical general works in connection with setting of quick watering for memu at koaa and rha station.
Electrical general works in connection with setting of quick watering for memu at koaa and rha station.
Read moreHubballi division: proposed construction of hostel for post graduate men and women doctors and dormitory at railway central hospital at hubballi.(maintenance period: 03 years)
Hubballi division: proposed construction of hostel for post graduate men and women doctors and dormitory at railway central hospital at hubballi.(maintenance period: 03 years)
Read more(1) outsourcing of preventive maintenance , monitoring and manning activities of psi assets in between bsp-apr of bilaspur division for a period of 24 months.(2) outsourcing of preventive maintenance , monitoring and manning activities of psi assets in between apr-kte and apr-abkp in cic section of bilaspur division for a period of 24 months.
(1) outsourcing of preventive maintenance , monitoring and manning activities of psi assets in between bsp-apr of bilaspur division for a period of 24 months.(2) outsourcing of preventive maintenance , monitoring and manning activities of psi assets in between apr-kte and apr-abkp in cic section of bilaspur division for a period of 24 months.
Read moreof your Industry type