Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement Of Road From Type Iv Qtr No.19 Upto Type V Share (531m)rims,Imphal.
|
| Description |
Improvement Of Road From Type Iv Qtr No.19 Upto Type V Share (531m)rims,Imphal.
|
| Organisation | Regional Institute of Medical Sciences | Central Govt. Ministry/Department |
| Tender Id | 2024_RIMS_833776_1 |
|
Reference Number |
43/2024-25/RIMS/Imphal |
| Tender Fee | 500 |
| EMD | 30772 |
| Tender Value | - |
| Place | As Per Tender Document |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=876186 |
| Start Date | November 06, 2024 18:30 |
| End Date |
Expired
15/11/2024
Expired 695 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
O m-2026-27-re-construction of rcc slab culvert at channel 4.077 km on d-19 of nizamsagar project, desaipet (v) banswada (m),kamareddy (dist).
O m-2026-27-re-construction of rcc slab culvert at channel 4.077 km on d-19 of nizamsagar project, desaipet (v) banswada (m),kamareddy (dist).
Read moreLaying of vdcc road from dyapa allavallu (h) to mendi yadagiri (h) ward no -19, in chilkur (v) in moinabad municipality under mgf/any other grants 2026-27.
Laying of vdcc road from dyapa allavallu (h) to mendi yadagiri (h) ward no -19, in chilkur (v) in moinabad municipality under mgf/any other grants 2026-27.
Read moreErection, testing and commissioning of switchyard for 7nos. 33/11 kv sub stations at i) mylaram (vg), (ii) sathapoor (vg), iii) marikal (vg), (iv) rachalapally (vg) v) jedipally (vg), vi) siddapur (vg), and vii) ramajipally (vg), of nagarkurnool circle
Erection, testing and commissioning of switchyard for 7nos. 33/11 kv sub stations at i) mylaram (vg), (ii) sathapoor (vg), iii) marikal (vg), (iv) rachalapally (vg) v) jedipally (vg), vi) siddapur (vg), and vii) ramajipally (vg), of nagarkurnool circle
Read moreErection, testing and commissioning of switchyard for 09nos. 33/11 kv sub stations at i) narreguda(vg), (ii) appaipally(vg), iii) lingampally (regadimylvar) (vg), (iv) polkampally (vg), v) gudur (vg), vi) jaffarpally (vg), vii) pudur (vg), viii) hazipur (vg), and ix) mekavanampally (vg), of vikarabad circle
Erection, testing and commissioning of switchyard for 09nos. 33/11 kv sub stations at i) narreguda(vg), (ii) appaipally(vg), iii) lingampally (regadimylvar) (vg), (iv) polkampally (vg), v) gudur (vg), vi) jaffarpally (vg), vii) pudur (vg), viii) hazipur (vg), and ix) mekavanampally (vg), of vikarabad circle
Read moreConstruction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Read moreErection, testing and commissioning of switchyard for 10nos. 33/11 kv sub stations at i) mutyalampalli(vg), ii) nalvanikunta(vg), iii) polkampally(vg), iv) chinnarevally(vg), v) gollapally(vg), vi)kallepally(vg), vii) munnanur(vg), viii) nakkalabanda(vg), ix) peddapally (vg), and x)gadiryala (vg) of mahabubnagar circle
Erection, testing and commissioning of switchyard for 10nos. 33/11 kv sub stations at i) mutyalampalli(vg), ii) nalvanikunta(vg), iii) polkampally(vg), iv) chinnarevally(vg), v) gollapally(vg), vi)kallepally(vg), vii) munnanur(vg), viii) nakkalabanda(vg), ix) peddapally (vg), and x)gadiryala (vg) of mahabubnagar circle
Read moreJunction widening at free left portions (i) at bvb junction towards fob (ii) at cvr channel free left (iii) at journalist colony junction (iv) at hdfc bank towards road 45, jubilee hills (v)at road no.45 towards checkpost near balakrishna residence, jubilee hills, ward-215 and 222, cir-36, khairatabad zone, ghmc (item.no3)
Junction widening at free left portions (i) at bvb junction towards fob (ii) at cvr channel free left (iii) at journalist colony junction (iv) at hdfc bank towards road 45, jubilee hills (v)at road no.45 towards checkpost near balakrishna residence, jubilee hills, ward-215 and 222, cir-36, khairatabad zone, ghmc (item.no3)
Read moreSupply, erection, testing and commissioning of the following works on turnkey basis in narayanpet district under makthal-narayanpet-kodangal lift irrigation scheme(package-3) i) 220/11kv liss at jayamma cheruvu, perapalla(v), narayanpet(m). ii) 220kv tmdc line from existing 220/132kv kosigiss to proposed 220/11kvss at jayamma cheruvu ss (27.298km). iii) 2nos. 220kv bays at 220/132kv ss kosigi. iv) 1no.132/11kv transformer bay at existing 132/11kv panchadevpahad ss
Supply, erection, testing and commissioning of the following works on turnkey basis in narayanpet district under makthal-narayanpet-kodangal lift irrigation scheme(package-3) i) 220/11kv liss at jayamma cheruvu, perapalla(v), narayanpet(m). ii) 220kv tmdc line from existing 220/132kv kosigiss to proposed 220/11kvss at jayamma cheruvu ss (27.298km). iii) 2nos. 220kv bays at 220/132kv ss kosigi. iv) 1no.132/11kv transformer bay at existing 132/11kv panchadevpahad ss
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreImprovement of road from type -iv qtr no.19 upto type v share (531m)rims,imphal.
Improvement of road from type -iv qtr no.19 upto type v share (531m)rims,imphal.
Read moreof your Industry type