Tender Details
Particulars | Details |
---|---|
Title |
Hubballi Ballari Section : Proposed Construction Of Road Over Bridge (Rob) At Km 134/700 800 In Lieu Of Lc 77 Between Ginigera Munirabad Stations At 1x30.0mt Clear Span Composite Girder (Railway Span) With 3x18.46mt Psc Girder And Cc Blocks As Approaches Including Temporary Di Road And Service Road On Both Sides Of Rob With Drainage Facility.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77430090 |
Reference Number |
UBL-ROB-LC-77 |
Tender Fee | 0 |
EMD | 12.88 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77430090/viewNitPdf_4716505.pdf |
Start Date | October 17, 2024 21:20 |
End Date |
08/11/2024 ( Expired 163 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hubballi division- hubballi-ballari section: 1) construction of subway at km 117/000-100 in lieu of lc no.66 at km.117/600-700 between koppal and ginigera stations (balance works). 2) construction of subway in lieu of lc no.62 at km 116/100-200 between koppal and ginigera stations (balance works)
For complete deion and other details, please refer to tender
Read moreConstruction of 4 lane rob including railway portion with n type steel girder and composite girder on pile foundation. psc girder on pile foundation and reinforced earth (re) wall in approaches in lieu of lc no. 25-b at rly. km 591/6-7 between jatpipli -bajana stations on viramgam - samakhiyali section of ahmedabad division of western railway under gati shakti unit, ahmedabad.
For complete deion and other details, please refer to tender
Read moreTumkuru-arsikere section: proposed construction of rob in lieu of lc no. 88 at km:149/900-150/000 with 1x30m bow-string girder and 2x18.71m psc girder re blocks (approach span) between tiptur and honnavalli road stations.
For complete deion and other details, please refer to tender
Read moreConstruction of road over bridge with subway in lieu of level crossing no.86 as 1x30m composite girder with 8x18m psc girder towards hassan side and 8x18m psc girder towards nh side at railway km.142/700-800 between tiptur and honnavalli road stations in tumakuru- arsikere section.(composite work).
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.38 at km 65/300-400 with 1x42m bowstring girder ( railway portion) 08x18.71m psc girder towards nh-73 baddihalli side and 5x18.71m psc girder towards nh-43 side and retaining wall on both sides of rob merging lengths between kyathasandra and tumakur stations including electrical works (composite work).
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no .39 at km 66/200-300 with 1x42m bowstring girder (railway portion) 08x18.71m psc girder towards nh-73 baddihalli side and 17x18.71m psc girder towards nh-43 side and retaining wall on both sides of rob merging lengths between kyathasandra and tumakur stations and proposed construction of lhs in lieu of lc 39 at km 66/200-300 as 1x5.5x2.5m rcc box including electrical works (composite work)
For complete deion and other details, please refer to tender
Read moreLonda-miraj section-construction of rob at km.613/800-900 in lieu of lc no 392 between belagavi-sambre station as 1x36m composite girder clear span ( railway portion) with 5x18.71m psc girder (nh end) and 6x18.71 m psc girder (mutaga end) and cc block in approaches between belagavi and sambre stations.(composite work)
For complete deion and other details, please refer to tender
Read moreLonda-miraj section- balance works of proposed construction of rob at km. 607/893 in lieu of lc no. 381, 1x54m bow-string girder (railway portion) 12x18m psc girder & cc block as approaches between desur and belagavi stations (composite work)
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.35 at km. 62/400-500 with 1x60m bowstring girder (railway portion) 10x18.71m psc girder24.945 mtr psc solid slab towards nh-48 side and 6x18.71m psc girder1x16.33 mtr psc solid slab towards mydala side and retaining wall on both sides of rob merging lengths between kyathasandra and nidavanda stations and construction of lhs in lieu of lc 35 at km 62/400-500 as 1x5.5x2.5m rcc box including electrical works- composite work.
For complete deion and other details, please refer to tender
Read moreConstruction of 2 lane rob in lieu of lc no.46 (manned) at km:78/340 with 1x42m bow string girder in mallasandra yard and construction of limited height subway of size 5.5x2.5m between tumkuru-mallasandra stations (composite work)
For complete deion and other details, please refer to tender
Read moreof your Industry type