Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Chain Link Fencing With Rcc Post At Mirigaon
|
| Description |
Installation Of 4 Feet High Chain Link Fencing 10 Gauge 3 Inch Mesh With 3 Strands Of Barbed Wire 1 Below 2 Above Supported By Pre Cast Rcc Pillars 2.1m X 0.125m X 0.125m At 2.5m Intervals Covering 1257 Rm
|
| Organisation | Pr. Chief Conservator of Forest and Head of Forest Force | State Govt. and UT |
| Tender Id | 2025_PCCF_42290_1 |
|
Reference Number |
FSET/B/D-07/Tender/2025/3950 Dated 21/01/2025 |
| Tender Fee | 1000 |
| EMD | 41758 |
| Tender Value | |
| Place | Mirigaon, Behali RF under Borgang Range |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=67975 |
| Start Date | January 22, 2025 15:30 |
| End Date |
Expired
11/02/2025
Expired 531 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreErection of chain-link fencing along with rcc post at rengma rf
Erection of chain-link fencing along with rcc post at rengma rf
Read moreProviding chain link fencing with rcc post at periphery of umrer colony of umrer area.
Providing chain link fencing with rcc post at periphery of umrer colony of umrer area.
Read moreConstruction of chain link wire fencing with rcc post at plot no. 58 smart city tt nagar bhopal
Construction of chain link wire fencing with rcc post at plot no. 58 smart city tt nagar bhopal
Read moreInstallation of chain link goat poof fencing with rcc post
Installation of chain linked goat poof fencing 4 ht with 10 gauge 3 dia link with 3 stand barbed wire to be fitted on pre cast rcc pillars including transportation fitting and fixing for 2800 rm
Read moreConstrustion of chain link fencing with angle iron post at mangu village.jjm
Construstion of chain link fencing with angle iron post at mangu village.jjm
Read moreConstruction of chain link fencing with rcc posts
Construction of 663 rm chain link fencing with rcc posts under campa scheme at tangia of jokai rf under dibrugarh range of dibrugarh division
Read moreConstruction and erection of chain linked fencing with rcc post and construction of camp hut
Construction and erection of chain linked fencing with rcc post and construction of camp hut
Read moreof your Industry type