Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🌳 Tender Invitation: Jungle Cleaning At Wrs Colony 🌳 The Ministry Of Railways, Under The Central Government, Invites Bids For The Cleaning Of The Jungle At Wrs Colony In Bilaspur For A Period Of Two Years. 🌳🛤️ 📅 Bid Submission Deadline: July 25, 2024, 11:00 Am Earnest Money Deposit (Emd): Inr 43700 Interested Contractors Must Submit Detailed Bids, Including Method Statements, Environmental Considerations, And Cost Effective Solutions, As Per The Tender Document Guidelines. Keywords: Cleaning Services, Jungle Maintenance, Wrs Colony, Ministry Of Railways, Central Government, Tender, Bilaspur, Emd| Particulars | Details |
|---|---|
| Title |
Cleaning Of Jungle At Wrs Colony For A Period Of Two Years.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75791870 |
|
Reference Number |
E-R-T-42-24-25 |
| Tender Fee | 0 |
| EMD | 43700 |
| Tender Value | - |
| Place | Bilaspur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75791870/viewNitPdf_4612711.pdf |
| Start Date | July 03, 2024 16:48 |
| End Date |
Expired
25/07/2024
Expired 794 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreHiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Read moreOutsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis
Outsourcing contract for dismantling and laying of 3.3kv and 230v oht lines at gdkcm (no.2,2a and 5), rg.i area for a period of 2 years on rate contract basis
Read moreHiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreCleaning of jungle at wrs colony for a period of two years.
For complete deion and other details, please refer to tender
Read more1.cleaning of jungle at wrs colony for a period of two years. 2.cleaning of jungle at bmy colony, zone-i, ii, iii, p.p. yard colony and bmy yard for a period of two year.
For complete deion and other details, please refer to tender
Read moreSurface cleaning by abrasive blasting of casnub bogie,coil spring and bvzi bogies at wrs for a period of two years
For complete deion and other details, please refer to tender
Read moreof your Industry type