Tender Details
Particulars | Details |
---|---|
Title |
A)repairing Of Rake Lifting Device Gear Assembly Of Thickener No. Ii B) Repairing And Overhauling Of Telpher (Eot Crane) In Fine Coal Section And C) Repairing And Overhauling Of Connecting Shaft And Coupling (Left And Right Side) Of 492 Belt Conveyor
|
Description |
A)repairing Of Rake Lifting Device Gear Assembly Of Thickener No. Ii B) Repairing And Overhauling Of Telpher (Eot Crane) In Fine Coal Section And C) Repairing And Overhauling Of Connecting Shaft And Coupling (Left And Right Side) Of 492 Belt Conveyor
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_319292_1 |
Reference Number |
PO/KTW/EnM/eTen/24-25/122 Dated-16.10.2024 |
Tender Fee | 0 |
EMD | 4300 |
Tender Value | |
Place | Kathara Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330936 |
Start Date | October 17, 2024 16:30 |
End Date |
28/10/2024 ( Expired 224 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconditioning/ repairing of right hand side hoist cylinder assembly of dumper sl. no. 90105 (cil-12218) and reconditioning/ repairing of left hand side hoist cylinder assembly of dumper sl. no. 90106 (cil-12219) at kathara ocp.
Reconditioning/ repairing of right hand side hoist cylinder assembly of dumper sl. no. 90105 (cil-12218) and reconditioning/ repairing of left hand side hoist cylinder assembly of dumper sl. no. 90106 (cil-12219) at kathara ocp.
Read moreRepairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Read moreRepairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Repairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Read moreTransportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Transportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Read moreRepairing/ strengthening of take-up structure, side stairs and bracing of unit 704 belt conveyor of moonidih coal washery.
Repairing/ strengthening of take-up structure, side stairs and bracing of unit 704 belt conveyor of moonidih coal washery.
Read moreRepairing / reconditioning of the motor controlling pannel of apron feeder,primary crusher and belt conveyor b side and repairing all the locks of mcc panels door installed at raw coal of rajrappa washery project.
Repairing / reconditioning of the motor controlling panel of apron feeder,primary crusher and belt conveyor b side and repairing all the locks of mcc panels door installed at raw coal of rajrappa washery project.
Read moreDismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.
Read moreRepairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.
Repairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.
Read moreRepairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma
Repairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma
Read moreUpkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Upkeepment of spilled materials from deck plates, rollers, gallery and ground area tail end side of 1201 and 1301 belt conveyor of ps-9 section at madhuban coal washery under block-ii area, bccl .
Read moreof your Industry type