Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ktps Vii Stage (1 X800 Mw)
|
| Description |
Providing Design, Engineering Consultancy Services For Preparation Of Detailed Project Report(dpr)along With Technical Details, Quantity Of Material Required(bill Of Quantities),Preparation Of The Cost Estimation For Execution Of Electrical, Mechanical, C And I And Civil Works For Extension Of Wet Ashing System From Northern Ash Pond I To Northern Ash Pond Ii At Ktps Stage Vii (1x800 Mw),Unit 12.Include Necessary Modifications/Up Gradation Of Various Equipment Required At Site Without Interrupting The Unit Operation
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 597054 |
|
Reference Number |
CEG/SEG-II/E4A11/KTPS-VII/ DPR-ASH Slurry pumps/ 07/2025-26 |
| Tender Fee | 379 |
| EMD | 5350 |
| Tender Value | |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | May 17, 2025 22:30 |
| End Date |
Expired
12/06/2025
Expired 370 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Re-conductoring package oh01 (ratle)
Re-conductoring package oh01 associated with transmission scheme for evacuation of power from ratle hep (850 mw) and kiru hep (624 mw): part-b.
Read moreBiennial maintenance contract of central ac system for stage-ii and stage-iii under emiph-i dept, sgtpp.
Biennial maintenance contract of central ac system for stage-ii and stage-iii under emiph-i dept, sgtpp.
Read morePeriodical services to certain otm accns under group iii and vii at rms
Periodical services to certain otm accns under group iii and vii at rms
Read moreCarrying out bunker hoist monorail modification work in unit-1 2 of 2x800 mw ntpc ramagundam
Carrying out bunker hoist monorail modification work in unit-1 2 of 2x800 mw ntpc ramagundam
Read moreStage 1 chp transformer spares (voltamp 11 or 0.433kv, 1.25mva)
Stage 1 chp transformer spares (voltamp 11 or 0.433kv, 1.25mva)
Read moreDredging and desilting of stage-i cw intake channel and surrounding
Dredging and desilting of stage-i cw intake channel and surroundingareas of rihand reservoir at ntpc rihandnagar sonebhadra up
Read moreBiennial contract for tsi system verification and calibration in stage i
Biennial contract for tsi system verification and calibration in stage iunits at ntpc simhadri
Read moreRfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w
Rfp for selection of agency for setting up 2.0 mw ac with 20 prasetnt extra dc system i.e 2.4 mw dc on-grid ground mounted solar photovoltaic power plant with 10-years of operation comprehensive maintenance and development of alleged infrastructure w
Read moreHiring of 80 mt crawler crane at ntpc talcher thermal stage-iii
Hiring of 80 mt crawler crane at ntpc talcher thermal stage-iii(2x660mw)for 6 months
Read moreDeployment of oem expert supervision during oh breakdown of koso make actuator valve assemblies at barh 5 by 660 mw
Deployment of oem expert supervision during oh breakdown of koso make actuator valve assemblies at barh 5 by 660 mw
Read moreof your Industry type