Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rcc Jetty Boundary Wall And Allied Infrastructure At Harishchandrapuram In Nw 4 On Epc Mode
|
| Description |
Construction Of Rcc Jetty, Boundary Wall And Allied 
Infrastructure At Harishchandrapuram In Nw 4 On Epc Mode
|
| Organisation | Inland Waterways Authority of India,MoS | Central Govt. Ministry/Department |
| Tender Id | 2025_IWAI_873885_1 |
|
Reference Number |
IWAI/NW-4/TerminalDev/2024-25 |
| Tender Fee | 5900 |
| EMD | 9.12 Lakh |
| Tender Value | - |
| Place | Harishchandrapuram Andhra Pradesh |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=918622 |
| Start Date | September 10, 2025 14:30 |
| End Date |
Expired
27/09/2025
Expired 334 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rcc drain with rcc culvert and sump room for conveyance system and construction of boundary wall at igc aurangabad (phase-i)
Construction of rcc drain with rcc culvert and sump room for conveyance system and construction of boundary wall at igc aurangabad (phase-i)
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Read moreConstruction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Construction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Read moreOnstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Onstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Read moreConstruction of cement concrete protection wall, cement concrete channels on distributaries of ranger canal in village zohama, gund, ranger, sogam etc. and construction of cement concrete channel, fall, lining walls, rcc channel on gam khul badipora
Construction of cement concrete protection wall, cement concrete channels on distributaries of ranger canal in village zohama, gund, ranger, sogam etc. and construction of cement concrete channel, fall, lining walls, rcc channel on gam khul badipora
Read moreConstruction of ward no 41, main bosi road se madhav mandal tu basi road to santlal boundary wall tab pcc pad and rcc drain ka nirman karya ward no 42 ram mandal lan mein anil padarth ke ghar se bhupendra ke ghar tak aur mukesh yadav ke ghar se subhash prasad ke ghar tak pcc pcc road and rcc brain ka nirman ward no-42 sudin mandal ke ghar se atmaram ke ghar tu bhagat ji ke ghar se ram mandal line ke men road tak pcc road and rcc drain ka construction tu gopal pandit ke ghar se dilip sahu ke ghar
Construction of ward no 41, main bosi road se madhav mandal tu basi road to santlal boundary wall tab pcc pad and rcc drain ka nirman karya ward no 42 ram mandal lan mein anil padarth ke ghar se bhupendra ke ghar tak aur mukesh yadav ke ghar se subhash prasad ke ghar tak pcc pcc road and rcc brain ka nirman ward no-42 sudin mandal ke ghar se atmaram ke ghar tu bhagat ji ke ghar se ram mandal line ke men road tak pcc road and rcc drain ka construction tu gopal pandit ke ghar se dilip sahu ke ghar tak pcc road and rcc drain ka nirman
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreConstruction of boundary wall and allied infrastructure at harishchandrapuram in nw4 on epc mode
Construction of boundary wall and allied infrastructure at harishchandrapuram in nw4 on epc mode
Read moreof your Industry type