Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 24.00 Mtr Span Rcc T Beam Bridge Over Dhaneshwar Khad At Rd. 1/150 Including Both Side Approaches On Okhroo To Nehra Via Keru Road
|
Description |
Construction Of 24.00 Mtr Span Rcc T Beam Bridge Over Dhaneshwar Khad At Rd. 1/150 Including Both Side Approaches On Okhroo To Nehra Via Keru Road
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_100091_1 |
Reference Number |
NO.PW-SRDD-CTR-20022-52 dt. 13.02.2025 |
Tender Fee | 5000 |
EMD | 3.67 Lakh |
Tender Value | |
Place | Dhami |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=147231 |
Start Date | February 16, 2025 00:00 |
End Date |
22/02/2025 ( Expired 107 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreConstruction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Read moreDesign and construction of 1x35 mtr span steeltrussed girder bridge over nallah sukhnag at mirchimar pattan baramulla on epc mode engineering procurement and construction mode
Design and construction of 1x35 mtr span steeltrussed girder bridge over nallah sukhnag at mirchimar pattan baramulla on epc mode( engineering procurement and construction mode
Read moreConstruction of 36.00 meter span pre-stressed rcc bridge on pathri roh river near sukarasa village at pathri to bahadrabad road in haridwar graconstituency of haridwar district under state sector
Construction of 36.00 meter span pre-stressed rcc bridge on pathri roh river near sukarasa village at pathri to bahadrabad road in haridwar graconstituency of haridwar district under state sector
Read moreConstruction of high level bridge (3x12.5m), over ubdc falling on shri hargobindpur sahib road nainekot ladhupur kiri afgana upto kahnuwan ghorewah road at rd 1410 mtr in district gurdaspur under scheme pmgsy iii batch iii
Construction of high level bridge (3x12.5m), over ubdc falling on shri hargobindpur sahib road nainekot ladhupur kiri afgana upto kahnuwan ghorewah road at rd 1410 mtr in district gurdaspur under scheme pmgsy iii batch iii
Read moreConstruction of high level bridge (single span 20 m) over kahnuwan swamp drain falling on kahnuwan to bhurian sainian via simbli upto chak sharif road rd2160 mtr including approaches in district gurdaspur
Construction of high level bridge (single span 20 m) over kahnuwan swamp drain falling on kahnuwan to bhurian sainian via simbli upto chak sharif road rd2160 mtr including approaches in district gurdaspur
Read moreof your Industry type