Tender Details
Particulars | Details |
---|---|
Title |
Medium Repair Of Rcf, Replacement Of Pa Fan Impeller Assembly.
|
Description |
Medium Repair Of Rcf, Replacement Of Pa Fan Impeller Assembly, Repair Of Casing, Cleaning And Fitting Of Oil System, Inspection And Revisioning Of Sadc Dampers Of Cpp Boiler 6, 7, 8 And Reducing Air Ingress In Ducts Along With Air Preheater Repair
|
Organisation | Bokaro Power Supply Company (P) Limited | Public Sector Undertakings |
Tender Id | 2024_BPSCL_199041_1 |
Reference Number |
24-25/C-057/LTE-018 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Power Plant,BPSCL,Bokaro Steel City |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=217797 |
Start Date | June 22, 2024 23:30 |
End Date |
08/07/2024 ( Expired 308 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreCreation of hydraulic and pneumatic repair bay (hprb) and upgradation of c-59 at nd mbi
Creation of hydraulic and pneumatic repair bay (hprb) and upgradation of c-59 at nd mbi.
Read moreReplacement of precision ac system along with buyback and post warranty camc for 7 years.
Replacement of precision ac system along with buyback and post warranty camc for 7 years.
Read moreProcurement of compressor assembly of air conditioning system of pc 2000-8 (k-1, k-2, k-3) of amlohri project
Procurement of compressor assembly of air conditioning system of pc 2000-8 (k-1, k-2, k-3) of amlohri project
Read moreRfg vent stack vessel, structurals repair and pipelines replacement in ammonia plant during tar 2025
Rfg vent stack vessel, structurals repair and pipelines replacement in ammonia plant during tar 2025
Read moreCustom bid for services - job contract for hiring of services for repair and maintenance of control
Read more
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Read moreRepair and rehabilitation of 05 nos. bridges
Repair and rehabilitation of 05 nos. bridges of nh-512 under n.h. division no. vii, p.w. roads directorate in the district of dakshin dinajpur, west bengal during the year 2024-25 on sbd mode. job no. nh-512/wb/2024-25/565
Read moreof your Industry type